TEXAS · WELLS · ZAPATA COUNTY · LEYENDECKER, G. L. LEASE · API 42-505-34522 · DISTRICT 04

Leyendecker G. L. #7

Shut in

Zapata County · Fandango (Wilcox Consolidated) field · Temp Abandoned  · Directional

Leyendecker G. L. #7 (API 42-505-34522) is a well in Zapata County operated by Stx Operating Company, completed October 11, 2004 and listed as temp abandoned on the RRC schedule, shut in December 1, 2023.

The RRC has issued one drilling permit (amended once), issued April 9, 2002, permitted to 17,108 ft.

It was permitted by Shell Western E&P and has since transferred to Stx Operating Company on the wellbore schedule.

No lease production has been reported under this well’s leases.

Operator of record

STX Operating Company

Permitted by Shell Western E&P; the EWA schedule now lists a different operator.

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBlock T Petroleum Inc.
Production reportsBlock "T" Petroleum, Inc.through Nov 2023
Latest permitShell Western E&PApr 9, 2002

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

17,108
total depth, ft
2
permits on file
Apr 9, 2002
last permit issued
Oct 11, 2004
completed
0
cumulative oil, bbl
2.1M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2002 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 11, 2004
Shut in
Dec 1, 2023
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Leyendecker, G. L. G-4-191584Fandango (Wilcox Consolidated)Block "T" Petroleum, Inc.102.1MOct 2002 – Jul 2026

Gas, mcf lease total

Last 12 months 0 · prior 12 0

050100202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Shell Western E&POct 2002 → Dec 2007
  2. 2Comstock Oil & Gas, LPJan 2008 → Jan 2011
  3. 3Rockdale Energy, LLCDec 2017 → Apr 2020
  4. 4Block "T" Petroleum, Inc.Mar 2022 → Nov 2023

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
518930-98DrillShell Western E&PApr 23, 2002Apr 9, 2002Jun 11, 200217,970
518930-99DrillShell Western E&PApr 9, 2002Apr 9, 2002—17,970

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 11, 2004Leyendecker G. L. G-4-191584Fandango (Wilcox Consolidated)STX Operating CompanyTemp Abandoned · shut in Dec 1, 202317,108

Perforations

Perforated and open-hole intervals.

FromToType
13,89813,908Perforated
14,80214,809Perforated
14,83614,846Perforated
15,07015,076Perforated
15,72015,730Perforated
16,13816,142Perforated
16,14616,156Perforated
16,28616,306Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
161,270201,051 S
11.759,01614.751,837 S
2.87513,1904.592 S
2.2513,1904.592 S
513,1926.5833 S
2.87517,0906.5833 S
2.87517,090——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 20, 2005Feb 28, 2005—
00Mar 19, 2003Jan 27, 2003—
00Jan 6, 2003Nov 20, 2002—
00Jan 2, 2003Oct 17, 2002Yes
00Dec 4, 2002——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50534522, documented in the API reference.