TEXAS · WELLS · ZAPATA COUNTY · API 42-505-34538 · DISTRICT 04

Jennings Ranch C #33

On schedule

Zapata County · Charco (9900) field · SWR-10-Well  · Directional

Fields on the latest permit · any of 2
Charco (9900) · Jennings Ranch (Lobo Cons.)
Not one formation; the well must be completed in one of them, and no target formation is stated. The district's wildcat field is also on the permit.

Jennings Ranch C #33 (API 42-505-34538) is a well in Zapata County operated by Hilcorp Energy Company, completed August 8, 2002 and listed as swr-10-well on the RRC schedule.

The RRC has issued one drilling permit, issued April 29, 2002, permitted to 13,036 ft.

It was permitted by Conoco Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 3 formation tops, including Perdido, Wilcox, Wills Point.

Its 2 leases have reported 28 barrels of oil and 1.79M mcf of gas since August 2002, last reporting volume in August 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Hilcorp Energy Company

Permitted by Conoco Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Mar 27, 2026
Permits on file
3,458
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitConoco Inc.Apr 29, 2002

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,036
total depth, ft
1
permits on file
Apr 29, 2002
last permit issued
Aug 8, 2002
completed
28
cumulative oil, bbl
1.79M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · AUG 2002 THROUGH AUG 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 8, 2002
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Wells nearby

Every well with a location on file around this well, in any state, nearest first.

Loading the map…

Open the full map →

Texas locations come from drilling permits, so most older Texas wells have none and are not listed.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH AUG 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Jennings Ranch C G-4-190803Jennings Ranch (Lobo Cons.)Hilcorp Energy Company1281.79MAug 2002 – Aug 2026
Jennings Ranch C G-4-190805Charco (9900)Hilcorp Energy Company100Aug 2002 – —

Gas, mcf lease total

Last 12 months 19,104 · prior 12 20,445(-7%)

01K2K202420252026

Wells named Jennings Ranch C

Hilcorp Energy Company's other wells filed under this lease name in Zapata County, newest permit first. The RRC gives a gas well its own lease number, so the name is what joins the wells of a unit.

Loading the lease's wells

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Conoco Inc.Aug 2002 → Dec 2002
  2. 2Conocophillips CompanyJan 2003 → Dec 2015
  3. 3Hilcorp Energy CompanyJan 2016 → Aug 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
519551-99DrillConoco Inc.Apr 29, 2002Apr 29, 2002Apr 25, 200213,315

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 8, 2002Jennings Ranch C G-4-190805Charco (9900)Hilcorp Energy CompanySWR-10-Well · shut in Aug 1, 200213,036
Aug 8, 2002Jennings Ranch C G-4-190803Jennings Ranch (Lobo Cons.)Hilcorp Energy CompanyProducing13,036

Formation tops

As filed on W-2/G-1. Subsea from 406 ft elevation.Download CSV →

FormationMD ftSubsea
Perdido9,550-9,144
Perdido9,554-9,148
WilcoxBASE OF LOWER WILCOX11,420-11,014
Wills Point12,860-12,454

Perforations

Perforated and open-hole intervals.

FromToType
9,95410,020Perforated
12,65012,660Perforated
12,67012,675Perforated
12,70612,720Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62585912.25310 S
79,1168.75250 S
4.513,0156.25415 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Oct 28, 2002Sep 19, 2002Yes
00Oct 10, 2002——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50534538, documented in the API reference.