TEXAS · WELLS · ZAPATA COUNTY · API 42-505-34574 · DISTRICT 04

Jennings Ranch C #40

Y

Zapata County · Charco (9900) field · SWR-10-Well  · Directional · Sidetrack

Fields on the latest permit · any of 2
Charco (9900) · Jennings Ranch (Lobo Cons.)
Not one formation; the well must be completed in one of them, and no target formation is stated. The district's wildcat field is also on the permit.

Jennings Ranch C #40 (API 42-505-34574) is a well in Zapata County operated by Hilcorp Energy Company, completed May 15, 2003 and listed as swr-10-well on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued July 1, 2002, permitted to 13,098 ft.

It was permitted by Conocophillips Company and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 3 formation tops, including Perdido, Wilcox, Wills Point.

Its 2 leases have reported 1.72K barrels of oil and 978K mcf of gas since May 2003, last reporting volume in April 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Hilcorp Energy Company

Permitted by Conocophillips Company; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,458
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitConocophillips CompanyJul 1, 2002

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,098
total depth, ft
2
permits on file
Jul 1, 2002
last permit issued
May 15, 2003
completed
1.72K
cumulative oil, bbl
978K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2003 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 15, 2003
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Jennings Ranch C G-4-197281Jennings Ranch (Lobo Cons.)Hilcorp Energy Company11.72K978KMay 2003 – Apr 2026
Jennings Ranch C G-4-197282Charco (9900)Hilcorp Energy Company100May 2003 – —

Gas, mcf lease total

Last 12 months 15,882 · prior 12 16,167(-2%)

05001K1.5K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Conocophillips CompanyMay 2003 → Dec 2015
  2. 2Hilcorp Energy CompanyJan 2016 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
521415-98Drill · sidetrackConocophillips CompanyMar 13, 2003Jul 1, 2002Aug 23, 200213,800
521415-99DrillConoco Inc.Jun 27, 2002Jul 1, 2002—14,122

Completions

CompletedLeaseFieldOperatorStatusDepth
May 15, 2003Jennings Ranch C G-4-197282Charco (9900)Hilcorp Energy CompanySWR-10-Well · shut in May 1, 200313,098
May 15, 2003Jennings Ranch C G-4-197281Jennings Ranch (Lobo Cons.)Hilcorp Energy CompanyProducing13,098

Formation tops

As filed on W-2/G-1. Subsea from 415 ft elevation.Download CSV →

FormationMD ftSubsea
Perdido9,103-8,688
WilcoxBASE LOWER WILCOX11,478-11,063
Wills Point12,910-12,495

Perforations

Perforated and open-hole intervals.

FromToType
9,1829,296Perforated
9,9039,985Perforated
11,98412,124Perforated
12,65412,819Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62588012.25365 S
78,8508.75200 S
4.513,0836.25460 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Nov 19, 2003Oct 7, 2003—
00Nov 5, 2003Oct 7, 2003Yes
00Oct 28, 2003——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50534574, documented in the API reference.