TEXAS · WELLS · ZAPATA COUNTY · JENNINGS RANCH AA LEASE · API 42-505-34647 · DISTRICT 04

Jennings Ranch AA #24

On schedule

Zapata County · Jennings Ranch (Lobo Cons.) field · Producing  · Directional

Fields on the latest permit · any of 2
Charco (9900) · Jennings Ranch (Lobo Cons.)
Not one formation; the well must be completed in one of them, and no target formation is stated. The district's wildcat field is also on the permit.

Jennings Ranch AA #24 (API 42-505-34647) is a well in Zapata County operated by Hilcorp Energy Company, completed March 21, 2003 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended twice), issued January 7, 2003, permitted to 13,000 ft.

It was permitted by Conocophillips Company and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 2 formation tops, including Wilcox, Wills Point.

Its lease has reported 1 barrels of oil and 885K mcf of gas since March 2003, last reporting volume in August 2026.

Operator of record

Hilcorp Energy Company

Permitted by Conocophillips Company; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)RRC P-5 file of Oct 22, 2026
P-5 last filed
Mar 27, 2026
Permits on file
3,460
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Aug 2026
Latest permitConocophillips CompanyJan 7, 2003

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,000
total depth, ft
3
permits on file
Jan 7, 2003
last permit issued
Mar 21, 2003
completed
1
cumulative oil, bbl
885K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · MAR 2003 THROUGH AUG 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 21, 2003
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Wells nearby

Every well with a location on file around this well, in any state, nearest first.

Loading the map…

Open the full map →

Texas locations come from drilling permits, so most older Texas wells have none and are not listed.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH AUG 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Jennings Ranch AA G-4-195087Jennings Ranch (Lobo Cons.)Hilcorp Energy Company11885KMar 2003 – Aug 2026

Gas, mcf lease total

Last 12 months 6,699 · prior 12 6,962(-4%)

05001K1.5K202420252026

Wells named Jennings Ranch AA

Hilcorp Energy Company's other wells filed under this lease name in Zapata County, newest permit first. The RRC gives a gas well its own lease number, so the name is what joins the wells of a unit.

Loading the lease's wells

Chain of custody

Operator on the lease's P-4

Each operator named on the P-4 filings for this well's lease (a gas well is its own lease), from the date its filing took effect. The P-4 is filed by lease, so a date before the well was drilled is the lease's.

OperatorFromTo
Hilcorp Energy CompanyJan 1, 2016today
Conocophillips CompanyMar 21, 2003Jan 1, 2016

Reporting production

Every operator that reported production on this well's lease, in order.

  1. 1Conocophillips CompanyMar 2003 → Dec 2015
  2. 2Hilcorp Energy CompanyJan 2016 → Aug 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
526970-97DrillConocophillips CompanyJun 17, 2003Jan 7, 2003Jan 30, 200313,800
526970-98DrillConocophillips CompanyJan 10, 2003Jan 7, 2003—13,800
526970-99DrillConocophillips CompanyJan 6, 2003Jan 7, 2003—13,800

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 21, 2003Jennings Ranch AA G-4-195087Jennings Ranch (Lobo Cons.)Hilcorp Energy CompanyProducing13,000

Formation tops

As filed on W-2/G-1. Subsea from 414 ft elevation.Download CSV →

FormationMD ftSubsea
WilcoxBASE OF LOWER WILCOX11,340-10,926
Wills Point12,741-12,327

Perforations

Perforated and open-hole intervals.

FromToType
11,82412,077Perforated
12,60812,726Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62586112.25304 S
78,8968.75205 S
4.512,9986.25371 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jul 10, 2003May 23, 2003Yes
00Jun 27, 2003——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50534647, documented in the API reference.