TEXAS · WELLS · ZAPATA COUNTY · API 42-505-34906 · DISTRICT 04

Jennings Ranch AA #36

On schedule

Zapata County · Jennings Ranch (Lobo Cons.) field · Producing  · Directional

Fields on the latest permit · any of 2
Charco (9900) · Jennings Ranch (Lobo Cons.)
Not one formation; the well must be completed in one of them, and no target formation is stated. The district's wildcat field is also on the permit.

Jennings Ranch AA #36 (API 42-505-34906) is a well in Zapata County operated by Hilcorp Energy Company, completed September 1, 2004 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued January 20, 2004, permitted to 13,250 ft.

It was permitted by Conocophillips Company and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 3 formation tops, including Perdido, Wilcox, Wills Point.

Its 2 leases have reported 4.74K barrels of oil and 5.37M mcf of gas since September 2004, last reporting volume in August 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Hilcorp Energy Company

Permitted by Conocophillips Company; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Mar 27, 2026
Permits on file
3,458
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Aug 2026
Latest permitConocophillips CompanyJan 20, 2004

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,250
total depth, ft
1
permits on file
Jan 20, 2004
last permit issued
Sep 1, 2004
completed
4.74K
cumulative oil, bbl
5.37M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · SEP 2004 THROUGH AUG 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Sep 1, 2004
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Wells nearby

Every well with a location on file around this well, in any state, nearest first.

Loading the map…

Open the full map →

Texas locations come from drilling permits, so most older Texas wells have none and are not listed.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH AUG 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Jennings Ranch AA G-4-206928Jennings Ranch (Lobo Cons.)Hilcorp Energy Company14.74K5.37MSep 2004 – Aug 2026
Jennings Ranch AA G-4-209647Charco (9900)Hilcorp Energy Company100Sep 2004 – —

Gas, mcf lease total

Last 12 months 7,777 · prior 12 6,084(+28%)

05001K202420252026

Wells named Jennings Ranch AA

Hilcorp Energy Company's other wells filed under this lease name in Zapata County, newest permit first. The RRC gives a gas well its own lease number, so the name is what joins the wells of a unit.

Loading the lease's wells

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Conocophillips CompanySep 2004 → Dec 2015
  2. 2Hilcorp Energy CompanyJan 2016 → Aug 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
540910-99DrillConocophillips CompanyJan 19, 2004Jan 20, 2004Jul 3, 200413,900

Completions

CompletedLeaseFieldOperatorStatusDepth
Sep 1, 2004Jennings Ranch AA G-4-209647Charco (9900)Hilcorp Energy CompanySWR-10-Well · shut in Sep 1, 200413,250
Sep 1, 2004Jennings Ranch AA G-4-206928Jennings Ranch (Lobo Cons.)Hilcorp Energy CompanyProducing13,250

Formation tops

As filed on W-2/G-1. Subsea from 427 ft elevation.Download CSV →

FormationMD ftSubsea
Perdido9,945-9,518
WilcoxBASE LOWER WILCOX11,290-10,863
WilcoxBASE LOWER WILCOX11,920-11,493
Wills Point13,071-12,644

Perforations

Perforated and open-hole intervals.

FromToType
10,05810,281Perforated
11,39011,412Perforated
11,79812,100Perforated
12,77812,838Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62586612.25305 S
78,9068.75150 S
4.513,2336.25460 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00May 10, 2006Oct 24, 2005—
00Sep 28, 2005Jan 18, 2005—
00Jul 26, 2005——
00Jun 3, 2005Jan 18, 2005Yes
00Mar 22, 2005——

Well logs

The RRC's map lists this well among those with logs online. Its monthly inventories loaded here, which start in July 2006, list none for it, so none are itemized.

Open the RRC's log search for this well ↗

Find logs withinmiles of this well:List →Map →

Search the well logs loaded into Petrora →

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

The logs loaded for this well are under Well logs, with the RRC's log search for it.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50534906, documented in the API reference.