TEXAS · WELLS · ZAPATA COUNTY · API 42-505-35237 · DISTRICT 04

Asche #100

Y

Zapata County · Charco (9900) field · Producing  · Vertical

Fields on the latest permit · any of 4
Charco (9200) · Charco (9400) · Charco (9900) · Munoz (Lobo)
Not one formation; the well must be completed in one of them, and no target formation is stated. The district's wildcat field is also on the permit.

Asche #100 (API 42-505-35237) is a well in Zapata County operated by Hilcorp Energy Company, completed August 15, 2005 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued April 11, 2005, permitted to 12,600 ft.

It was permitted by Houston Exploration Company, The and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 8 formation tops, including Perdido Unconformity, Top Perdido B, Base Perdido B, Bse Perdido B.

Its 2 leases have reported 214 barrels of oil and 1.35M mcf of gas since June 2005, last reporting volume in April 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Hilcorp Energy Company

Permitted by Houston Exploration Company, The; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,458
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitHouston Exploration Company, TheApr 11, 2005

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,600
total depth, ft
1
permits on file
Apr 11, 2005
last permit issued
Aug 15, 2005
completed
214
cumulative oil, bbl
1.35M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 2005 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 15, 2005
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Asche G-4-212466Charco (9900)Hilcorp Energy Company12141.35MJun 2005 – Apr 2026
Asche G-4-210967Munoz (Lobo)Hilcorp Energy Company100Jun 2005 – —

Gas, mcf lease total

Last 12 months 21,369 · prior 12 22,143(-3%)

01K2K3K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Houston Exploration Company, TheJun 2005 → Jun 2007
  2. 2Forest Oil CorporationJul 2007 → Apr 2012
  3. 3Hilcorp Energy CompanyApr 2013 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
558979-99DrillHouston Exploration Company, TheMar 14, 2005Apr 11, 2005May 9, 200513,100

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 15, 2005Asche G-4-212466Charco (9900)Hilcorp Energy CompanyProducing12,600
Jun 10, 2005Asche G-4-210967Munoz (Lobo)Hilcorp Energy CompanySWR-10-Well · shut in Jul 1, 200512,600

Formation tops

As filed on W-2/G-1. Subsea from 415 ft elevation.Download CSV →

FormationMD ftSubsea
Perdido Unconformity9,565-9,150
Top Perdido B10,231-9,816
Base Perdido B10,274-9,859
Bse Perdido B10,274-9,859
Lobo Unconformity11,253-10,838
Top Lobo 111,703-11,288
Top Lobo 311,752-11,337
Top Lobo 612,072-11,657
Top Lobo 612,702-12,287

Perforations

Perforated and open-hole intervals.

FromToType
10,23310,235Perforated
10,24710,251Perforated
10,26010,273Perforated
11,70511,712Perforated
11,71511,722Perforated
12,09812,101Perforated
12,10712,112Perforated
12,12412,137Perforated
12,17512,177Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62576512.25350 S
78,9868.75400 S
4.512,5606.125400 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Apr 7, 2006Aug 29, 2005—
00Feb 3, 2006Jul 29, 2005Yes
00Dec 2, 2005——
00Nov 18, 2005Jul 29, 2005Yes
00Sep 27, 2005——

Well logs

1 log loaded from the RRC's log index, the latest received Sep 15, 2008. Resistivity. These are the logs loaded into Petrora from the Railroad Commission's inventories, not necessarily every log run on the well. The RRC holds the files; each opens from its log search for the well. The kind is the RRC's description of the log; the interval is the one filed for it.

Open the RRC's log search for this well ↗
Logas describedFiles Intervalft, as filedDatereceivedSizeMB
RESISTIVITYSpans Perdido Unconformity, Top Perdido B, Bse Perdido B, Base Perdido B, Lobo Unconformity, Top Lobo 1, Top Lobo 3, Top Lobo 6TIFF8,976 to 12,606Sep 15, 2008run May 30, 20050.81

"Spans" is by this well's own filed formation tops: a formation runs from its top to the next deeper top filed, and the deepest runs to the bottom of the log. Depths are measured along the wellbore, so on a horizontal the lateral counts in the formation it was landed in.

Find logs withinmiles of this well:List →Map →

Search the well logs loaded into Petrora →

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

The logs loaded for this well are under Well logs, with the RRC's log search for it.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.