TEXAS · WELLS · ZAPATA COUNTY · ZACHRY LEASE · API 42-505-35358 · DISTRICT 04
Zachry #1
Zapata County · Cisco-Benavides (Lobo Cons.) field · Vertical
Zachry #1 (API 42-505-35358) is a plugged well in Zapata County, plugged June 5, 2013, last operated by EP Energy E&P Company L.P..
The RRC has issued one drilling permit, issued September 8, 2005, permitted to 10,000 ft.
It was permitted by Laredo Energy and has since transferred to EP Energy E&P Company L.P. on the wellbore schedule.
Completion filings report 2 formation tops, including Wilcox, Wills Point.
Operator of record
Permitted by Laredo Energy; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Jan 30, 2024
- Permits on file
- 1,518
- Phone
- (713) 997-1000
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | EP Energy E&P Company L.P. |
| Production reports | El Paso E & P Company, L. P.through Jan 2011 |
| Latest permit | Laredo EnergySep 8, 2005 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,000
- total depth, ft
- 1
- permits on file
- Sep 8, 2005
- last permit issued
- May 9, 2006
- completed
- 0
- cumulative oil, bbl
- 20.9K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 2006 THROUGH Jun 2013
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 9, 2006
- Shut in
- —
- Plugged
- Jun 5, 2013
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Zachry G-4-221161 | Cisco-Benavides (Lobo Cons.) | EP Energy E&P Company, L.P. | 1 | 0 | 20.9K | May 2006 – Jun 2013 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Laredo EnergyMay 2006 → Oct 2006
- 2El Paso E&P Zapata, L.P.Nov 2006 → Dec 2010
- 3El Paso E & P Company, L. P.Jan 2011 → Jan 2011
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 606063-99 | Drill | Laredo Energy | Sep 8, 2005 | Sep 8, 2005 | Sep 12, 2005 | 10,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| May 9, 2006 | Zachry G-4-221161 | Cisco-Benavides (Lobo Cons.) | EP Energy E&P Company L.P. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 455 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| WilcoxLOWER WILCOX | 7,100 | -6,645 |
| Wills Point | 9,250 | -8,795 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,826 | 9,044 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 758 | 12.25 | 322 S |
| 7 | 7,100 | 8.75 | 500 S |
| 4.5 | 9,915 | 6.125 | 300 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 9, 2007 | Jul 11, 2006 | Yes |
| 00 | Nov 10, 2006 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-505-35358 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-505-35358 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/50535358, documented in the API reference.