WELL · 42-505-35457 · DISTRICT 4

A. Garza #19

Y

Zapata County · Charco (9900) field · Producing  · Vertical

A. Garza #19 (API 42-505-35457) is a well in Zapata County operated by Hilcorp Energy Company, completed April 20, 2006 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued December 30, 2005, permitted to 10,300 ft.

It was permitted by Houston Exploration Company, The and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 5 formation tops, including Perdido Unconformity, Top Perdido A, Base Perdido A, Top Perdido B.

No lease production has been reported under this well’s leases.

Operator of record

Hilcorp Energy Company

Permitted by Houston Exploration Company, The; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitHouston Exploration Company, TheDec 30, 2005

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,300
total depth, ft
1
permits on file
Dec 30, 2005
last permit issued
Apr 20, 2006
completed
0
cumulative oil, bbl
1.63M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 2006 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Apr 20, 2006
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
A. Garza G-4-218452Charco (9900)Hilcorp Energy Company101.63MFeb 2006 – Jul 2026
A. Garza G-4-218654Charco (9200)Hilcorp Energy Company100Feb 2006 – Jul 2026

Gas, mcf lease total

Last 12 months 11,812 · prior 12 8,293(+42%)

01K2K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Houston Exploration Company, TheFeb 2006 → Jun 2007
  2. 2Forest Oil CorporationJul 2007 → Dec 2012
  3. 3Hilcorp Energy CompanyJan 2013 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
611759-99DrillHouston Exploration Company, TheDec 29, 2005Dec 30, 2005Jan 20, 200610,800

Completions

CompletedLeaseFieldOperatorStatusDepth
Apr 20, 2006A. Garza G-4-218452Charco (9900)Hilcorp Energy CompanyProducing10,300
Feb 24, 2006A. Garza G-4-218654Charco (9200)Hilcorp Energy CompanySWR-10-Well · shut in Aug 1, 201110,300

Formation tops

As filed on W-2/G-1. Subsea from 429 ft elevation.Download CSV →

FormationMD ftSubsea
Perdido Unconformity8,881-8,452
Top Perdido A8,913-8,484
Base Perdido A8,990-8,561
Top Perdido B9,811-9,382
Base Perdido B9,915-9,486

Perforations

Perforated and open-hole intervals.

FromToType
8,9608,986Perforated
9,8469,850Perforated
9,8669,880Perforated
9,9009,914Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62577012.25350 S
78,3718.75200 S
3.510,2803.5375 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 8, 2007May 15, 2006—
00Jan 22, 2007Apr 10, 2006Yes
00Jan 9, 2007Apr 10, 2006Yes
00Sep 1, 2006——
00Aug 28, 2006——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50535457, documented in the API reference.