TEXAS · WELLS · ZAPATA COUNTY · EL EBANITO LEASE · API 42-505-35614 · DISTRICT 04

El Ebanito #2

Shut in

Zapata County · Haynes (Middle Wilcox Cons.) field · Temp Abandoned  · Vertical

El Ebanito #2 (API 42-505-35614) is a well in Zapata County operated by Petrovybe Opco LLC, completed November 18, 2006 and listed as temp abandoned on the RRC schedule, shut in May 1, 2024.

The RRC has issued one drilling permit (amended once), issued June 13, 2006, permitted to 12,146 ft.

It was permitted by Legend Natural Gas II, LP and has since transferred to Petrovybe Opco LLC on the wellbore schedule.

Completion filings report 2 formation tops, including Charco Unconsolidated, Charo-Basil Uncons.

Its lease has reported 28 barrels of oil and 401K mcf of gas since November 2006, last reporting volume in April 2026.

Operator of record

Petrovybe Opco LLC

Permitted by Legend Natural Gas II, LP; the EWA schedule now lists a different operator.

Based in
Plano, TX
P-5 status
Active – Extension (X)
P-5 last filed
Dec 29, 2025
Permits on file
6
Phone
(214) 810-6207

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePetrovybe Opco LLC
Production reportsPetrovybe Opco LLCthrough Apr 2026
Latest permitLegend Natural Gas II, LPJun 13, 2006

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,146
total depth, ft
2
permits on file
Jun 13, 2006
last permit issued
Nov 18, 2006
completed
28
cumulative oil, bbl
401K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2006 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 18, 2006
Shut in
May 1, 2024
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
El Ebanito G-4-224973Haynes (Middle Wilcox Cons.)Petrovybe Opco LLC128401KNov 2006 – Apr 2026

Gas, mcf lease total

Last 12 months 703 · prior 12 0

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Legend Natural Gas II, LPNov 2006 → Feb 2015
  2. 2Trinity River Energy Oper, LLCMar 2015 → Oct 2017
  3. 3Wagner Oil CompanyNov 2017 → Jan 2021
  4. 4Fletcher Operating, LLCFeb 2021 → Apr 2024
  5. 5Petrovybe Opco LLCDec 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
620854-98DrillLegend Natural Gas II, LPAug 16, 2006Jun 13, 2006Sep 20, 200615,000
620854-99DrillLegend Natural Gas II, LPJun 12, 2006Jun 13, 2006—15,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 18, 2006El Ebanito G-4-224973Haynes (Middle Wilcox Cons.)Petrovybe Opco LLCTemp Abandoned · shut in May 1, 202412,146

Formation tops

As filed on W-2/G-1. Subsea from 456 ft elevation.Download CSV →

FormationMD ftSubsea
Charco Unconsolidated10,520-10,064
Charo-Basil Uncons10,730-10,274

Perforations

Perforated and open-hole intervals.

FromToType
10,74210,750Perforated
11,65011,656Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37569617.5415 S
9.6256,36912.25223 S
79,7008.5—
4.512,1466.25—

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00May 9, 2007Jan 22, 2007Yes
00Mar 1, 2007——

Well logs

1 log loaded from the RRC's log index, the latest received Oct 26, 2009. Density, Neutron, Resistivity. These are the logs loaded into Petrora from the Railroad Commission's inventories, not necessarily every log run on the well. The RRC holds the files; each opens from its log search for the well. The kind is the RRC's description of the log; the interval is the one filed for it.

Open the RRC's log search for this well ↗
Logas describedFiles Intervalft, as filedDatereceivedSizeMB
COMBINATION: RESISTIVITY/NEUTRON/DENSITY POROSITYSpans Charco Unconsolidated, Charo-Basil UnconsTIFF9,662 to 13,520Oct 26, 2009run Oct 24, 20063.80

"Spans" is by this well's own filed formation tops: a formation runs from its top to the next deeper top filed, and the deepest runs to the bottom of the log. Depths are measured along the wellbore, so on a horizontal the lateral counts in the formation it was landed in.

Find logs withinmiles of this well:List →Map →

Search the well logs loaded into Petrora →

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

The logs loaded for this well are under Well logs, with the RRC's log search for it.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50535614, documented in the API reference.