WELL · 42-505-35764 · DISTRICT 4

Laurel O.M. Estate #17

Y

Zapata County · Charco (9400) field · SWR-10-Well  · Vertical

Laurel O.M. Estate #17 (API 42-505-35764) is a well in Zapata County operated by Hilcorp Energy Company, completed January 7, 2008 and listed as swr-10-well on the RRC schedule.

The RRC has issued one drilling permit, issued January 19, 2007, permitted to 11,870 ft.

It was permitted by Chesapeake Operating, Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 3 formation tops, including Carrizo, Perdido, Lobo Unconformity.

No lease production has been reported under this well’s leases.

Operator of record

Hilcorp Energy Company

Permitted by Chesapeake Operating, Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitChesapeake Operating, Inc.Jan 19, 2007

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,870
total depth, ft
1
permits on file
Jan 19, 2007
last permit issued
Jan 7, 2008
completed
0
cumulative oil, bbl
679K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 2008 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 7, 2008
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Laurel, O. M. Estate G-4-235227Jennings Ranch (Lobo Cons.)Hilcorp Energy Company10679KJan 2008 – Jul 2026
Laurel, O.M. Estate G-4-236295Charco (9400)Hilcorp Energy Company100Jan 2008 – Jul 2026

Gas, mcf lease total

Last 12 months 12,826 · prior 12 12,490(+3%)

01K2K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chesapeake Operating, Inc.Jan 2008 → Aug 2014
  2. 2Hilcorp Energy CompanySep 2014 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
630596-99DrillChesapeake Operating, Inc.Dec 15, 2006Jan 19, 2007Nov 22, 200714,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jan 7, 2008Laurel O.M. Estate G-4-236295Charco (9400)Hilcorp Energy CompanySWR-10-Well · shut in Jan 1, 200811,870
Jan 7, 2008Laurel O. M. Estate G-4-235227Jennings Ranch (Lobo Cons.)Hilcorp Energy CompanyProducing11,870

Formation tops

As filed on W-2/G-1. Subsea from 481 ft elevation.Download CSV →

FormationMD ftSubsea
CarrizoCARRIZO WILCOX5,910-5,429
Perdido9,350-8,869
Lobo Unconformity10,950-10,469

Perforations

Perforated and open-hole intervals.

FromToType
9,52011,600Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62599212.25382 S
78,1908.75279 S
4.512,2006.25365 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 9, 2008Mar 3, 2008—
00Jul 2, 2008——
00Jun 20, 2008Mar 17, 2008—
00Jun 2, 2008Mar 3, 2008Yes
00May 23, 2008——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50535764, documented in the API reference.