TEXAS · WELLS · ZAPATA COUNTY · API 42-505-35822 · DISTRICT 04

El Clareno #7

Y

Zapata County · Roleta (7483) field · SWR-10-Well  · Directional

El Clareno #7 (API 42-505-35822) is a well in Zapata County operated by Merit Energy Company, completed June 6, 2007 and listed as swr-10-well on the RRC schedule.

The RRC has issued 2 drilling permits in 2007, permitted to 9,620 ft.

It was permitted by El Paso E&P Zapata, L.P. and has since transferred to Merit Energy Company on the wellbore schedule.

Completion filings report one formation top, including Wilcox.

No lease production has been reported under this well’s leases.

Operator of record

Merit Energy Company

Permitted by El Paso E&P Zapata, L.P.; the EWA schedule now lists a different operator.

Based in
Dallas, TX
P-5 status
Active (A)
P-5 last filed
Nov 7, 2025
Permits on file
1,049
Phone
(972) 701-8377

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMerit Energy Company
Production reportsMerit Energy Companythrough Apr 2026
Latest permitEl Paso E&P Zapata, L.P.Dec 11, 2007

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,620
total depth, ft
2
permits on file
Dec 11, 2007
last permit issued
Jun 6, 2007
completed
0
cumulative oil, bbl
1.23M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 2007 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 6, 2007
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
El Clareno G-4-229265Roleta (Wilcox Consolidated)Merit Energy Company101.23MMar 2007 – Jul 2026
El Clareno G-4-238175Roleta (7483)Merit Energy Company100Jun 2007 – Jul 2026

Gas, mcf lease total

Last 12 months 14,160 · prior 12 13,308(+6%)

01K2K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1El Paso E&P Zapata, L.P.Mar 2007 → Dec 2010
  2. 2El Paso E & P Company, L. P.Jan 2011 → Jul 2012
  3. 3EP Energy E&P Company, L.P.Aug 2012 → Oct 2013
  4. 4Cantera Operating, LLCNov 2013 → Nov 2017
  5. 5Merit Energy CompanyDec 2017 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
650374-99RecompletionEl Paso E&P Zapata, L.P.Nov 29, 2007Dec 11, 2007Apr 4, 200720,000
633815-99DrillEl Paso E&P Zapata, L.P.Feb 20, 2007Feb 23, 2007Feb 28, 200720,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 6, 2007El Clareno G-4-238175Roleta (7483)Merit Energy CompanySWR-10-Well · shut in Jun 1, 20079,620
Jun 6, 2007El Clareno G-4-229265Roleta (Wilcox Consolidated)Merit Energy CompanyProducing9,620

Formation tops

As filed on W-2/G-1. Subsea from 317 ft elevation.Download CSV →

FormationMD ftSubsea
Wilcox7,790-7,473

Perforations

Perforated and open-hole intervals.

FromToType
7,4837,618Perforated
8,2498,274Perforated
8,7338,832Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62575512.25350 S
9.625755—350 S
76,6988.75335 S
76,698—335 S
4.59,6206.125225 S
4.59,620—225 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 24, 2009Dec 18, 2007—
00Sep 26, 2008May 16, 2008—
00Sep 3, 2008Jan 31, 2008—
00Sep 3, 2008Jul 9, 2007—
00Aug 25, 2008——
00Nov 14, 2007Sep 25, 2007—
00Sep 7, 2007May 7, 2007Yes
00Sep 5, 2007——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50535822, documented in the API reference.