WELL · 42-505-35880 · DISTRICT 4

Donnell Minerals #1

Y

Zapata County · T Patch (Reklaw Oso) field · Producing  · Vertical

Donnell Minerals #1 (API 42-505-35880) is a well in Zapata County operated by Mortimer Production Company, completed August 8, 2007 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued May 31, 2007, permitted to 7,700 ft.

It was permitted by Thorp Petroleum Corporation and has since transferred to Mortimer Production Company on the wellbore schedule.

Completion filings report 6 formation tops, including Yequa, Crockett, Queen City, Pogo (Top Reclaw).

No lease production has been reported under this well’s leases.

Operator of record

Mortimer Production Company

Permitted by Thorp Petroleum Corporation; the EWA schedule now lists a different operator.

Based in
San Antonio, TX
P-5 status
Active (A)
P-5 last filed
Sep 12, 2025
Permits on file
53
Phone
(210) 821-6168

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMortimer Production Company
Production reportsMortimer Production Companythrough Apr 2026
Latest permitThorp Petroleum CorporationMay 31, 2007

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,700
total depth, ft
2
permits on file
May 31, 2007
last permit issued
Aug 8, 2007
completed
0
cumulative oil, bbl
255K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2007 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 8, 2007
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Donnell Minerals G-4-229978T Patch (Reklaw Oso)Mortimer Production Company10255KAug 2007 – Jul 2026

Gas, mcf lease total

Last 12 months 4,128 · prior 12 4,480(-8%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Thorp Petroleum CorporationAug 2007 → Jun 2009
  2. 2Rlu Operating, LLCJul 2009 → Dec 2019
  3. 3Mortimer Production CompanyJan 2020 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
639529-98DrillThorp Petroleum CorporationJul 25, 2007May 31, 2007Jul 13, 20077,700
639529-99DrillThorp Petroleum CorporationMay 23, 2007May 31, 2007—7,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-229978————

Formation tops

As filed on W-2/G-1. Subsea from 425 ft elevation.Download CSV →

FormationMD ftSubsea
Yequa3,130-2,705
Crockett4,300-3,875
Queen City5,390-4,965
Pogo (Top Reclaw)6,730-6,305
Aransas7,210-6,785
Nueces7,290-6,865

Perforations

Perforated and open-hole intervals.

FromToType
7,2147,219Perforated
7,2617,265Perforated
7,2697,278Perforated
7,3267,332Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,32012.25550 S
76,5988.75390 S
4.57,4686.25160 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 15, 2007Aug 23, 2007Yes
00Oct 11, 2007——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50535880, documented in the API reference.