WELL · 42-505-36247 · DISTRICT 4
Flores #1
Zapata County · Haynes (Middle Wilcox Cons.) field · Vertical
Flores #1 (API 42-505-36247) is a plugged well in Zapata County, plugged September 8, 2014, last operated by Laredo Energy Operating LLC.
The RRC has issued one drilling permit (amended once), issued August 7, 2008, permitted to 12,500 ft.
It was permitted by Laredo Energy and has since transferred to Laredo Energy Operating LLC on the wellbore schedule.
Completion filings report 2 formation tops, including Wilcox, Wills Point.
Operator of record
Permitted by Laredo Energy; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Mar 9, 2022
- Permits on file
- 177
- Phone
- (713) 600-6016
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Laredo Energy Operating LLC |
| Production reports | Laredo Energythrough Jun 2013 |
| Latest permit | Laredo EnergyAug 7, 2008 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 12,500
- total depth, ft
- 2
- permits on file
- Aug 7, 2008
- last permit issued
- Oct 29, 2008
- completed
- 0
- cumulative oil, bbl
- 198K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 2008 THROUGH Sep 2014
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 29, 2008
- Shut in
- —
- Plugged
- Sep 8, 2014
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Flores G-4-247784 | Haynes (Middle Wilcox Cons.) | Laredo Energy Operating, LLC | 1 | 0 | 198K | Oct 2008 – Sep 2014 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Laredo EnergyOct 2008 → Jun 2013
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 667208-98 | Drill | Laredo Energy | Dec 9, 2008 | Aug 7, 2008 | Aug 15, 2008 | 12,500 |
| 667208-99 | Drill | Laredo Energy | Jul 21, 2008 | Aug 7, 2008 | — | 12,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-247784 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 376 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Wilcox | 4,550 | -4,174 |
| WilcoxLOWER WILCOX | 7,000 | -6,624 |
| Wills Point | 10,700 | -10,324 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,798 | 7,958 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 430 | 17.5 | 489 S |
| 7 | 6,998 | 8.75 | 400 S |
| 4.5 | 8,507 | 6.125 | 250 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 29, 2009 | Mar 9, 2009 | Yes |
| 00 | Jun 10, 2009 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-505-36247 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-505-36247 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/50536247, documented in the API reference.