WELL · 42-507-31472 · DISTRICT 1

Thoreen George et AL #2

Plugged

Zavala County · Thoreen (Elaine 3530) field  · Vertical

Thoreen George ET AL #2 (API 42-507-31472) is a plugged well in Zavala County, plugged February 20, 1986, last operated by Jennings Exploration Company.

The RRC has issued 2 drilling permits between 1981 and 1983, permitted to 4,300 ft.

Operator of record

Jennings Exploration Company

Based in
Beeville, TX
P-5 status
Inactive (I)
P-5 last filed
Jan 13, 2025
Permits on file
133
Phone
(361) 362-3529

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJennings Exploration Company
Production reportsnone
Latest permitJennings Exploration Co.Jul 20, 1983
4,300
total depth, ft
2
permits on file
Jul 20, 1983
last permit issued
Feb 23, 1981
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 23, 1981
Shut in
—
Plugged
Feb 20, 1986

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
202173-99RecompletionJennings Exploration Co.Jul 20, 1983Jul 20, 1983—3,800
109314-99DrillJennings Exploration Co.Feb 18, 1981Feb 18, 1981—4,300

Perforations

Perforated and open-hole intervals.

FromToType
3,5313,550Perforated
3,7843,794Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62512812.2590 S
2.3753,490——
4.53,8707.875900 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 26, 1984Jan 24, 1984—
00Feb 22, 1984Jan 24, 1984—
00Jan 12, 1984Mar 16, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50731472, documented in the API reference.