TEXAS · WELLS · ZAVALA COUNTY · API 42-507-31627 · DISTRICT 01

Lasiter M.L. #13

Plugged

Zavala County · Big Wells (San Miguel) field  · Vertical

Lasiter M.L. #13 (API 42-507-31627) is a plugged well in Zavala County, plugged October 13, 2023, last operated by Bluestar Energy Inc..

The RRC has issued 2 drilling permits between 1981 and 1992, permitted to 7,400 ft.

It was permitted by Oryx Energy Company and has since transferred to Bluestar Energy Inc. on the wellbore schedule.

Completion filings report 3 formation tops, including 1st Lime, Anacacho, Austin Chalk.

Its 2 leases have reported 13.1K barrels of oil and 19 mcf of gas since January 1993, last reporting in July 2026. The leases carry 5 wells, so these are lease totals, not this well alone.

Operator of record

Bluestar Energy Inc.

Permitted by Oryx Energy Company; the EWA schedule now lists a different operator.

Based in
Dallas, TX
P-5 status
Inactive (I)
P-5 last filed
Sep 29, 2022
Permits on file
2
Phone
(214) 871-0999

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleOryx Energy Company
Production reportsBluestar Energy, Inc.through Dec 2010
Latest permitOryx Energy CompanyDec 17, 1992

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,400
total depth, ft
2
permits on file
Dec 17, 1992
last permit issued
Mar 22, 1993
completed
13.1K
cumulative oil, bbl
19
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 22, 1993
Shut in
—
Plugged
Oct 13, 2023

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Lasiter, M.L. O-1-13695Big Wells (San Miguel)Bluestar Energy, Inc.413.1K19Mar 1993 – Jul 2026
Lupe, John B. -C- O-1-7997Pearsall (Austin Chalk)Oryx Energy Company100Jan 1993 – Apr 1993

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Oryx Energy CompanyMar 1993 → Jun 1994
  2. 2McDaniel Company, Inc., TheJul 1994 → Nov 1994
  3. 3Omni Operating Company(a)Aug 1997 → Mar 1999
  4. 4Bluestar Energy, Inc.Oct 1999 → Dec 2010

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
407374-99RecompletionOryx Energy CompanyDec 17, 1992Dec 17, 1992Feb 11, 19936,510
147833-99DrillConvest Energy CorporationDec 31, 1981Dec 31, 1981—7,400

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 22, 1993Lasiter M.L. O-1-13695Big Wells (San Miguel)Bluestar Energy Inc.Plugged—
Mar 23, 1982Lupe John B. -C- O-1-7997Pearsall (Austin Chalk)Oryx Energy CompanyPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 657 ft elevation.Download CSV →

FormationMD ftSubsea
1ST Lime5,998-5,341
Anacacho6,146-5,489
Austin Chalk6,443-5,786

Perforations

Perforated and open-hole intervals.

FromToType
5,5275,554Perforated
6,5626,972Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62552112.25365 S
2.3756,500——
5.57,3207.875835 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 23, 1993Mar 29, 1993Yes
00Apr 6, 1993——
00Jan 12, 1984Apr 5, 1982—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50731627, documented in the API reference.