WELL · 42-507-31632 · DISTRICT 1
Pryor Ranch #54
Zavala County · Winn-Dulce (Olmos) field · Vertical
Pryor Ranch #54 (API 42-507-31632) is a plugged well in Zavala County, plugged January 4, 1989, last operated by Winn Exploration/Dulce Company.
The RRC has issued 3 drilling permits between 1982 and 1985, permitted to 3,302 ft.
Completion filings report 5 formation tops, including Escondido, Olmos, Del Monte, Bracero.
Operator of record
Winn Exploration/Dulce Company
- Based in
- Eagle Pass, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Nov 2, 1990
- Permits on file
- 293
- Phone
- (210) 773-1183
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Winn Exploration/Dulce Company |
| Production reports | none |
| Latest permit | Winn Exploration/Dulce CompanyAug 7, 1985 |
- 3,302
- total depth, ft
- 3
- permits on file
- Aug 7, 1985
- last permit issued
- Jul 30, 1985
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 30, 1985
- Shut in
- —
- Plugged
- Jan 4, 1989
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 282186-99 | Recompletion | Winn Exploration/Dulce Company | Aug 6, 1985 | Aug 7, 1985 | — | 3,302 |
| 251375-99 | Recompletion | Winn Exploration/Dulce Company | Sep 12, 1984 | Sep 13, 1984 | — | 3,302 |
| 148548-99 | Drill | Winn Exploration/Dulce Company | Jan 26, 1982 | Jan 26, 1982 | — | 3,302 |
Formation tops
As filed on W-2/G-1. Subsea from 666 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,649 | 2,653 | Perforated |
| 3,044 | 3,054 | Perforated |
| 3,154 | 3,158 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 402 | 12.25 | 170 S |
| 2.375 | 3,014 | — | — |
| 4.5 | 3,297 | 7.875 | 740 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 22, 1985 | Aug 5, 1985 | — |
| 00 | Aug 15, 1985 | — | — |
| 00 | Sep 27, 1984 | Sep 13, 1984 | — |
| 00 | Sep 26, 1984 | Sep 13, 1984 | — |
| 00 | Jan 12, 1984 | May 18, 1982 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-507-31632 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-507-31632 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/50731632, documented in the API reference.