WELL · 42-507-32262 · DISTRICT 1
Hardy #12
Zavala County · Horizontal · Sidetrack
Hardy #12 (API 42-507-32262) is a permitted horizontal well in Zavala County filed by Christico Petroleum Company; no completion report is on file yet.
The RRC has issued 2 drilling permits between 1989 and 1991, permitted to 9,600 ft.
Completion filings report 2 formation tops, including Anacacho, Austin Chalk.
Its lease has reported 39.4K barrels of oil and 126K mcf of gas since January 1993, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- San Antonio, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Mar 6, 1995
- Permits on file
- 111
- Phone
- (210) 821-5664
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | STP Production, LLCthrough Nov 2007 |
| Latest permit | Christico Petroleum CompanyNov 22, 1991 |
- 9,600
- total depth, ft
- 2
- permits on file
- Nov 22, 1991
- last permit issued
- —
- completed
- 39.4K
- cumulative oil, bbl
- 126K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hardy O-1-12375 | Pearsall (Austin Chalk) | STP Production, LLC | 2 | 39.4K | 126K | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Christico Petroleum CompanyJan 1993 → Apr 1995
- 2McEna Inc.May 1995 → Jul 1998
- 3Okla. Magic Circle Energy Corp.Aug 1998 → Apr 1999
- 4Stratco Operating Co., Inc.Jun 1999 → Feb 2000
- 5Forbes, C. C. CompanyMar 2000 → Nov 2002
- 6Botasch OperatingDec 2002 → Sep 2004
- 7STP Production, LLCOct 2004 → Sep 2007
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 394358-99 | Recompletion · sidetrack | Christico Petroleum Company | Nov 22, 1991 | Nov 22, 1991 | — | 9,600 |
| 365102-99 | Drill | Christico Petroleum Company | Oct 12, 1989 | Oct 12, 1989 | Nov 8, 1989 | 7,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-1-12375 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 578 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Anacacho | 6,160 | -5,582 |
| Austin Chalk | 6,500 | -5,922 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,446 | 8,463 | Open hole |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 689 | 14.75 | 485 S |
| 7 | 6,446 | 9.875 | 410 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 13, 1990 | Jan 17, 1990 | Yes |
| 00 | Feb 7, 1990 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-507-32262 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-507-32262 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/50732262, documented in the API reference.