TEXAS · WELLS · ZAVALA COUNTY · API 42-507-32847 · DISTRICT 01

Traylor West Zav A #A 4H

Y

Zavala County · Briscoe Ranch (Eagleford) field · Producing  · Horizontal

Traylor West Zav A #A 4H (API 42-507-32847) is a horizontal well in Zavala County operated by Exco Operating Company LP, completed May 9, 2012 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued November 9, 2011, permitted to 5,484 ft.

It was permitted by Chesapeake Operating, Inc. and has since transferred to Exco Operating Company LP on the wellbore schedule.

Completion filings report 3 formation tops, including Anacacho, Austin Chalk, Eagle Ford.

Its 2 leases have reported 729K barrels of oil and 441K mcf of gas since December 2011, last reporting in July 2026. The leases carry 9 wells, so these are lease totals, not this well alone.

Operator of record

Exco Operating Company LP

Permitted by Chesapeake Operating, Inc.; the EWA schedule now lists a different operator.

Based in
Dallas, TX
P-5 status
Active (A)
P-5 last filed
Aug 22, 2025
Permits on file
515
Phone
(214) 368-2084

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleExco Operating Company LP
Production reportsExco Operating Company, LPthrough Apr 2026
Latest permitChesapeake Operating, Inc.Nov 9, 2011

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,484
total depth, ft
1
permits on file
Nov 9, 2011
last permit issued
May 9, 2012
completed
729K
cumulative oil, bbl
441K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2011 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 9, 2012
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 9 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Traylor West Zav C O-1-15993Briscoe Ranch (Eagleford)Exco Operating Company, LP8695K423KDec 2011 – Jul 2026
Traylor West Zav A O-1-20581Briscoe Ranch (Eagleford)Exco Operating Company, LP133.9K18.7KMar 2022 – Jul 2026

Oil, barrels lease total

Last 12 months 18,251 · prior 12 22,130(-18%)

01K2K3K202420252026

Gas, mcf lease total

Last 12 months 10,327 · prior 12 9,760(+6%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chesapeake Operating, Inc.Jun 2012 → Jun 2013
  2. 2Exco Operating Company, LPJul 2013 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
727725-99DrillChesapeake Operating, Inc.Nov 4, 2011Nov 9, 2011Feb 17, 20129,000

Completions

CompletedLeaseFieldOperatorStatusDepth
May 9, 2012Traylor West Zav A O-1-20581Briscoe Ranch (Eagleford)Exco Operating Company LPProducing5,484
May 9, 2012Traylor West Zav C O-1-15993Briscoe Ranch (Eagleford)Exco Operating Company LPNot on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 729 ft elevation.Download CSV →

FormationMD ftSubsea
Anacacho4,595-3,866
Austin Chalk4,898-4,169
Anacacho4,995-4,266
Eagle Ford5,451-4,722

Perforations

Perforated and open-hole intervals.

FromToType
6,01512,132Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,54012.25685 S
5.512,2438.752,485 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 25, 2022Oct 28, 2019—
00Feb 7, 2020Oct 28, 2019—
00Nov 5, 2012Aug 28, 2012Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50732847, documented in the API reference.