WELL · 42-700-30066 · DISTRICT 4
State Tract 1065-L (SE 1/4) #1
S Padre IS-LB County · Harena (Rob 43) field · Vertical
State Tract 1065-L (SE 1/4) #1 (API 42-700-30066) is a plugged well in S Padre IS-LB County, plugged November 27, 1990, last operated by Mobil Producing TX. & N.M. Inc..
The RRC has issued 2 drilling permits between 1983 and 1985, permitted to 7,800 ft.
Completion filings report 9 formation tops, including "A" Sand, A Sand, "B" Sand, "B" Prime Sand.
Operator of record
Mobil Producing TX. & N.M. Inc.
- Based in
- Spring, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jun 4, 2025
- Permits on file
- 6,763
- Phone
- (346) 474-9142
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Mobil Producing TX. & N.M. Inc. |
| Production reports | none |
| Latest permit | Mobil Producing TX. & N.M. Inc.May 20, 1985 |
- 7,800
- total depth, ft
- 2
- permits on file
- May 20, 1985
- last permit issued
- Jan 12, 1984
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2008
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 12, 1984
- Shut in
- —
- Plugged
- Nov 27, 1990
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| State Tract 1065-L (SE 1/4) G-4-110047 | Harena (Rob 43) | Mobil Producing TX. & N.M. Inc. | 1 | 0 | 0 | Jan 1993 – Jul 2008 |
| — G-4-117852 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 275842-99 | Recompletion | Mobil Producing TX. & N.M. Inc. | May 20, 1985 | May 20, 1985 | — | 7,800 |
| 224461-99 | Drill | Mobil Producing TX. & N.M. Inc. | Nov 29, 1983 | Dec 5, 1983 | Dec 12, 1983 | 7,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-110047 | — | — | — | — |
| — | — G-4-117852 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 88 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| "A" Sand | 5,065 | -4,977 |
| A Sand | 5,208 | -5,120 |
| "B" Sand | 5,320 | -5,232 |
| "B" Prime Sand | 5,410 | -5,322 |
| B Sand | 5,508 | -5,420 |
| B Prime Sand | 5,614 | -5,526 |
| Amph "B" | 6,792 | -6,704 |
| Rob 43 | 6,934 | -6,846 |
| Amph B | 7,204 | -7,116 |
| Rob 43 | 7,343 | -7,255 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,204 | 7,222 | Perforated |
| 7,343 | 7,426 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 24 | 307 | — | — |
| 10.75 | 2,500 | — | — |
| 10.75 | 2,563 | 14.75 | 1,360 sx |
| 7 | 5,760 | — | — |
| 7 | 8,050 | 9.5 | 1,350 sx |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 30, 1985 | Aug 23, 1985 | — |
| 00 | Sep 10, 1985 | — | — |
| 00 | May 2, 1984 | Mar 6, 1984 | — |
| 00 | Apr 28, 1984 | Mar 6, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-700-30066 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-700-30066 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/70030066, documented in the API reference.