TEXAS · WELLS · MATGRDA IS-LB COUNTY · STATE TRACT 526-L, SW/4, GOM LEASE · API 42-703-30172 · DISTRICT 03
State Tract 526-L SW/4 Gom #7
Matgrda IS-LB County · Cavallo (7000) field · Vertical
State Tract 526-L SW/4 Gom #7 (API 42-703-30172) is a plugged well in Matgrda IS-LB County, plugged July 18, 1999, last operated by Seagull Energy E&P Inc..
The RRC has issued 3 drilling permits between 1979 and 1984, permitted to 10,533 ft.
It was permitted by Houston Oil & Minerals Corp. and has since transferred to Seagull Energy E&P Inc. on the wellbore schedule.
Operator of record
Permitted by Houston Oil & Minerals Corp.; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Apr 28, 2000
- Permits on file
- 172
- Phone
- (713) 265-6000
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | Houston Oil & Minerals Corp.Jan 27, 1984 |
- 10,533
- total depth, ft
- 3
- permits on file
- Jan 27, 1984
- last permit issued
- Feb 26, 1984
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 1999
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 26, 1984
- Shut in
- —
- Plugged
- Jul 18, 1999
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| State Tract 526-L, SW/4, Gom G-3-109328 | Cavallo (7000) | Seagull Energy E&P Inc. | 1 | 0 | 0 | Jan 1993 – Jul 1999 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 227770-99 | Recompletion | Houston Oil & Minerals Corp. | Jan 24, 1984 | Jan 27, 1984 | — | 10,533 |
| 191323-99 | Recompletion | Houston Oil & Minerals Corp. | Apr 12, 1983 | Apr 12, 1983 | — | 10,000 |
| 41578-99 | Drill | Houston Oil & Minerals Corp. | Jan 29, 1979 | Jan 29, 1979 | — | 10,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Feb 26, 1984 | State Tract 526-L SW/4 Gom G-3-109328 | Cavallo (7000) | Seagull Energy E&P Inc. | Plugged | — |
| Oct 30, 1979 | State Tract 526-L SW/4 G-3-86888 | Cavallo (8300) | Houston Oil & Minerals Corp. | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,857 | 7,860 | Perforated |
| 9,352 | 9,400 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 24 | 339 | 24 | — |
| 10.75 | 3,723 | 14.75 | 2,400 S |
| 3.5 | 9,050 | — | — |
| 7.625 | 10,100 | 9.875 | 650 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 26, 1984 | Mar 6, 1984 | — |
| 00 | Mar 14, 1984 | Mar 6, 1984 | — |
| 00 | Jan 12, 1984 | Jan 23, 1980 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-703-30172 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-703-30172 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/70330172, documented in the API reference.