WYOMING · WELLS · CAMPBELL COUNTY · API 49-005-62531
Stuart 43-72-2A-11-1H
Waiting on ApprovalHorizontal oil well
- Permitted by
- Vermilion Energy USA LLCWOGCC lists no operator of record
- Last operator of record
- Emep II Acquisitions LLC
- County
- Campbell
- Field
- WC
A horizontal oil well in Campbell County, Wyoming. WOGCC status: waiting on approval.
- 0
- bbl oil, 12 months through Aug 2026
- 0
- Mcf gas, same 12 months
- 0
- bbl produced water, same 12 months
- 0
- bbl oil, lifetime · 0 Mcf gas
- Status
- — · WOGCC: Waiting on Approval
- Received
- Mar 7, 2025
- Operator
- Vermilion Energy USA LLC
- Proposed formation
- Turner
- Target depth
- 9,708 ft
- Proposed bottom hole
- 43.70967, -105.46551 ↗
7 APDs on file for this well, newest first
| Approved | Received | Operator | Status | Formation | Target depth |
|---|---|---|---|---|---|
| — | Mar 7, 2025 | Vermilion Energy USA LLC | —Waiting on Approval | Turner | 9,708 ft |
| — | Mar 10, 2023 | Vermilion Energy USA LLC | ApprovedExpired Permit | Turner | 9,708 ft |
| — | Apr 2, 2021 | Petro-Hunt LLC | ApprovedExpired Permit | Turner | 9,708 ft |
| — | Apr 4, 2019 | Petro-Hunt LLC | ApprovedExpired Permit | Turner | 9,708 ft |
| Apr 6, 2017 | Jan 10, 2017 | Petro-Hunt LLC | ApprovedExpired Permit | Turner | 9,708 ft |
| Dec 29, 2015 | Aug 17, 2015 | Petro-Hunt LLC | ApprovedExpired Permit | Turner | 9,708 ft |
| Aug 21, 2014 | Jun 20, 2014 | Petro-Hunt LLC | ApprovedExpired Permit | Turner | 9,708 ft |
Wells nearby
Every well with a location on file around this well, in any state, nearest first.
Formation tops nearby
Operators of record
| Operator | From | To |
|---|---|---|
| Emep II Acquisitions LLC | Jul 31, 2025 | today |
| Vermilion Energy USA LLC | Jul 1, 2021 | Jul 31, 2025 |
| Petro-Hunt LLC | Jan 1, 2000 | Jul 1, 2021 |
Well record
- API number
- 49-005-62531
- Location
- SE SE 35-44N-72W · 88 FSL, 634 FEL
- Coordinates
- 43.73800, -105.46530 ↗
- Elevation
- 5,028 ft
- Measured depth
- 19,691 ft
- Total depth
- 9,708 ft
- Land
- Private
- Basin, as WOGCC files it
- Powder River Basin
- APD
- Approved Apr 6, 2017
- Proposed formation
- Turner
- Target depth
- 9,708 ft
About this data
Wyoming Oil and Gas Conservation Commission (WOGCC), from its public database extracts. Status and type are in WOGCC's own words. Production and injection are what operators filed on form 2, by well and month; twelve-month figures end in Aug 2026, the last month whose filings are in. Locations are from the well's location plat and are approximate. The Commission's production file names each well's current operator on every month, so an operator's figures are those of the wells it operates today. Nothing is estimated.
Developers: this page as JSON is GET /v1/data/wells/4900562531, documented in the API reference.