WYOMING · WELLS · CAMPBELL COUNTY · API 49-005-80163

Republic 4571-332821-2PH

Permitted, not spuddedHorizontal oil wellWOGCC status: Permit to Drill

Permit operator
Emep II Operating LLC
County
Campbell
Field
Hilight

A horizontal oil well in Campbell County, Wyoming. WOGCC status: permit to drill.

Its APD was approved on October 29, 2026 for a target depth of 6,285 ft; no spud date is on file.

0
bbl oil, 12 months through Aug 2026
0
Mcf gas, same 12 months
0
bbl produced water, same 12 months
0
bbl oil, lifetime · 0 Mcf gas
Status
Approved · WOGCC: Active Permit
Received
Jul 21, 2026
Approved
Oct 29, 2026
Wellbore
Horizontal
Proposed formation
Parkman
Target depth
6,285 ft
Proposed bottom hole
43.86848, -105.40319 ↗

Wells nearby

Every well with a location on file around this well, in any state, nearest first.

Loading the map…

Open the full map →

Formation tops nearby

Well record

API number
49-005-80163
Location
NE NE 5-44N-71W · 246 FNL, 370 FEL
Elevation
4,290 ft
Measured depth
22,578 ft
Total depth
6,285 ft
Basin, as WOGCC files it
Powder River Basin
APD
Approved Oct 29, 2026
Proposed formation
Parkman
Target depth
6,285 ft

About this data

Wyoming Oil and Gas Conservation Commission (WOGCC), from its public database extracts. Status and type are in WOGCC's own words. Production and injection are what operators filed on form 2, by well and month; twelve-month figures end in Aug 2026, the last month whose filings are in. Locations are from the well's location plat and are approximate. The Commission's production file names each well's current operator on every month, so an operator's figures are those of the wells it operates today. Nothing is estimated.

Developers: this page as JSON is GET /v1/data/wells/4900580163, documented in the API reference.