WYOMING · WELLS · NATRONA COUNTY · API 49-025-22832
Waltman Unit 37A
ActiveVertical gas wellWOGCC status: Producing Gas Well
- Operator of record
- Hilcorp Energy Company
- Permitted by
- Chevron USA Inc
- County
- Natrona
- Field
- Waltman
A vertical gas well in Natrona County, Wyoming, operated by Hilcorp Energy Company. WOGCC status: producing gas well.
Spudded November 16, 1996.
Completed in one field: Waltman.
It has reported 1,013 bbl of oil, 865,293 Mcf of gas, and 5,907 bbl of water since August 1997; in the twelve months through August 2026, 12 bbl, 2,767 Mcf, and 0 bbl.
- 12
- bbl oil, 12 months through Aug 2026
- 2,767
- Mcf gas, same 12 months
- 0
- bbl produced water, same 12 months
- 1,013
- bbl oil since Aug 1997 · 865,293 Mcf gas
- Status
- Approved · WOGCC: Drilling or Drilled Permit
- Approved
- Oct 22, 1996
- Operator
- Chevron USA Inc
- Proposed formation
- Fort Union
- Target depth
- 5,196 ft
Wells nearby
Every well with a location on file around this well, in any state, nearest first.
Reported production
Every month on file for this well on form 2, summed across its fields and the operators that filed it. The newest months can still be amended.
12 months through Aug 2026 2,767 · prior 12 142
Waltman Unit 37A: Gas by month.
Completions
ONE PER RESERVOIR THE WELL IS COMPLETED IN
| Field | Status | Perforations, ft | Completed | Produced | Oil, bbl | Gas, Mcf | Water, bbl |
|---|---|---|---|---|---|---|---|
| WaltmanFort Union | Active | — | Feb 6, 1997 | Aug 1997 to Aug 2026 | 1,013 | 865,293 | 5,907 |
Formation tops
Download CSV →1 tops as filed, by depth. A formation filed more than once is listed each time.
| Formation | Depth |
|---|---|
| FORT UNION | 3,770 ft |
Source: Wyoming Oil and Gas Conservation Commission, "Geological Markers Based On Form 3"
Formation tops nearby
Well record
- API number
- 49-025-22832
- Location
- NE NW 31-37N-86W · 184 FNL, 1644 FWL
- Coordinates
- 43.13987, -107.21437 ↗
- Elevation
- 6,195 ft
- Elevation KB
- 6,213 ft
- Total depth
- 5,196 ft
- Land
- Federal
- Basin, as WOGCC files it
- Wind River Basin
- APD
- Approved Oct 22, 1996
- Proposed formation
- Fort Union
- Target depth
- 5,196 ft
- Spudded
- Nov 16, 1996
About this data
Wyoming Oil and Gas Conservation Commission (WOGCC), from its public database extracts. Status and type are in WOGCC's own words. Production and injection are what operators filed on form 2, by well and month; twelve-month figures end in Aug 2026, the last month whose filings are in. Locations are from the well's location plat and are approximate. The Commission's production file names each well's current operator on every month, so an operator's figures are those of the wells it operates today. Nothing is estimated.
Developers: this page as JSON is GET /v1/data/wells/4902522832, documented in the API reference.