WYOMING · WELLS · UINTA COUNTY · API 49-041-20697

Champlin 457 D 2AH

ActiveHorizontal gas wellWOGCC status: Producing Gas Well

Operator of record
Hilcorp Energy Company
County
Uinta

A horizontal gas well in Uinta County, Wyoming, operated by Hilcorp Energy Company. WOGCC status: producing gas well.

Spudded October 3, 1994.

Completed in 5 fields: Whitney Canyon-Carter Creek, Whitney Canyon-Carter Creek, Whitney Canyon-Carter Creek, Whitney Canyon-Carter Creek, and 1 more.

It has reported 114,706 bbl of oil, 19,346,149 Mcf of gas, and 65,294 bbl of water since November 1995; in the twelve months through August 2026, 0 bbl, 190,068 Mcf, and 0 bbl.

0
bbl oil, 12 months through Aug 2026
190,068
Mcf gas, same 12 months
0
bbl produced water, same 12 months
114,706
bbl oil since Nov 1995 · 19.3M Mcf gas
Status
Approved · WOGCC: Drilling or Drilled Permit
Received
May 18, 2001
Approved
May 31, 2001
Wellbore
Horizontal
Proposed formation
Madison
Target depth
16,782 ft

2 APDs on file for this well, newest first

ApprovedReceivedOperatorStatusFormationTarget depth
May 31, 2001May 18, 2001Amoco Production CompanyApprovedDrilling or Drilled PermitMadison16,782 ft
Jan 17, 1985—Amoco Production CompanyApprovedDrilling or Drilled PermitWeber15,785 ft

Wells nearby

Every well with a location on file around this well, in any state, nearest first.

Loading the map…

Open the full map →

Reported production

Every month on file for this well on form 2, summed across its fields and the operators that filed it. The newest months can still be amended.

12 months through Aug 2026 190,068 · prior 12 188,107(+1%)

0500K1M1996199820002002200420062008201020122014201620182020202220242026

Champlin 457 D 2AH: Gas by month.

Completions

ONE PER RESERVOIR THE WELL IS COMPLETED IN

FieldStatusPerforations, ftCompletedProducedOil, bblGas, McfWater, bbl
Whitney Canyon-Carter CreekMadisonActive13,914 to 16,920 MDSep 30, 2001Oct 2001 to Aug 2026107,34419,011,33865,294
Whitney Canyon-Carter CreekMadison-Weber———Nov 1995 to Mar 20027,361334,8100
Whitney Canyon-Carter CreekWeber———Apr 1997 to Apr 1997110
Whitney Canyon-Carter CreekWeber-Mission-Lodgepole——Mar 28, 1996————
Whitney Canyon-Carter CreekBig Horn——Aug 19, 1985————

Formation tops

Download CSV →

8 tops as filed, by depth. A formation filed more than once is listed each time.

FormationDepth
PREUSS SALT4,817 ft
NUGGET7,965 ft
ANKAREH9,098 ft
PHOSPHORIA12,280 ft
WEBER12,754 ft
AMSDEN13,306 ft
MADISON13,499 ft
BIG HORN15,334 ft

Source: Wyoming Oil and Gas Conservation Commission, "Geological Markers Based On Form 3"

Formation tops nearby

Operators of record

OperatorFromTo
Hilcorp Energy CompanyMay 1, 2025today
North Shore Exploration & Prod LLCDec 31, 2018May 1, 2025
Merit Energy CompanyJan 1, 2000Dec 31, 2018

Well record

API number
49-041-20697
Location
NW SE 13-18N-120W · 2040 FSL, 1883 FEL
Elevation
7,147 ft
Elevation KB
7,177 ft
Total depth
16,972 ft
Perforations
13,914 to 16,920 ft
Basin, as WOGCC files it
Overthrust Belt
APD
Approved May 31, 2001
Proposed formation
Madison
Target depth
16,782 ft
Spudded
Oct 3, 1994

About this data

Wyoming Oil and Gas Conservation Commission (WOGCC), from its public database extracts. Status and type are in WOGCC's own words. Production and injection are what operators filed on form 2, by well and month; twelve-month figures end in Aug 2026, the last month whose filings are in. Locations are from the well's location plat and are approximate. The Commission's production file names each well's current operator on every month, so an operator's figures are those of the wells it operates today. Nothing is estimated.

Developers: this page as JSON is GET /v1/data/wells/4904120697, documented in the API reference.