FIELDS · TEXAS · FIELD 43106200
Hubbard (Cherry Canyon)
Field · District 08 · Loving County and 1 more · Cherry Canyon in every state →
Hubbard (Cherry Canyon) is an RRC field with 34 leases on file reported by 24 operators, mostly in Loving County.
No volume has been reported since April 2025.
Greenlake Energy Operating, LLC holds the most, 5 leases and 406,914 barrels of oil lifetime.
Lifetime, the field has reported 924,950 barrels of oil and 3.8 million mcf of gas, across 31 oil and 3 gas leases.
- 34
- leases on file · 31 oil, 3 gas
- 0
- leases reporting volume
- 24
- operators, all time
- 7
- active wellbores of 50 · 3 operators today
- 0
- bbl oil, 12 months through Apr 2026
- 0
- Mcf gas, same 12 months
- 924,950
- bbl oil, lifetime · 3.8M Mcf gas
Every well completed in it, searchable →
Reported production by month
12 months through Apr 2026 0 · prior 12 9(-100%)
Hubbard (Cherry Canyon): Oil by month.
Operators
BY LIFETIME OIL ON THEIR LEASES · TOP 12
| Operator | Leases | Oil, bbl | Gas, Mcf | Last reported |
|---|---|---|---|---|
| Greenlake Energy Operating, LLC | 5 | 407K | 754K | Dec 2019 |
| Wolf Energy, Inc. | 14 | 367K | 2.47M | Feb 2021 |
| Powderhorn Operating, LLC | 1 | 60.6K | 341K | Apr 2025 |
| OXY USA Inc. | 2 | 41.5K | 75.1K | Jun 2010 |
| Diamondback E&P LLC | 1 | 19.1K | 104K | Aug 2011 |
| CPX Energy Operating, LLC | 1 | 15.5K | 14.4K | Jun 2020 |
| Endeavor Energy Resources L.P. | 1 | 6.71K | 47.6K | Aug 2006 |
| Remuda Operating Company | 1 | 6.04K | 6.8K | Nov 1996 |
| TRP Operating LLC | 1 | 1.13K | 17.9K | Oct 2010 |
| Apache Corporation | 3 | 0 | 0 | — |
| Waterbridge Stateline LLC | 2 | 0 | 0 | — |
| San Mateo Wolf WTR Resour., LLC | 2 | 0 | 0 | — |
Counties
- Loving County → 30 leases
- Reeves County → 4 leases
Latest completions
BY COMPLETION DATE
| Well | Operator | County | Completed | Top perf, ft | Oil, 12 mo | Gas, 12 mo |
|---|---|---|---|---|---|---|
| Layla SWD #1 | Waterbridge Stateline LLC | Loving | May 10, 2025 | — | — | — |
| Robin 8 #1SW | Apache Corporation | Reeves | May 1, 2024 | — | — | — |
| Clapton SWD #1 | Waterbridge Stateline LLC | Loving | Nov 15, 2022 | — | — | — |
| Morley #1 | Greenlake Energy Operating LLC | Loving | Aug 19, 2019 | — | — | — |
| Hubbard Mrs. Frances #2 | Wolf Energy Inc. | Loving | Apr 17, 2019 | — | — | — |
| Hamilton #1 | Greenlake Energy Operating LLC | Loving | Mar 14, 2019 | — | — | — |
| Hubbard #4 | Wolf Energy Inc. | Loving | Dec 5, 2018 | — | — | — |
| Chapman #1 | Wolf Energy Inc. | Loving | Nov 6, 2018 | — | — | — |
| Chapman SWD #1 | San Mateo Wolf WTR Resour. LLC | Loving | Sep 28, 2018 | — | — | — |
| Hopper #1 | Wolf Energy Inc. | Loving | Mar 23, 2017 | — | — | — |
About this data
Field 43106200 from RRC PDQ lease reports: lifetime totals and lease and operator counts from the field summary; the monthly series summed from every lease report naming the field, cut at the statewide reported-through month, Apr 2026. Oil includes condensate from gas leases and gas includes casinghead gas from oil leases, as the RRC totals them. Counties from the wells completed on each lease. Completions are the wellbores the RRC schedule ties to the field. The formation, Cherry Canyon, is read from the field's name. Nothing is estimated.
Developers: this page as JSON is GET /v1/data/fields/tx/43106200, documented in the API reference.