FIELDS · TEXAS · FIELD 45761700
Jared (Travis Peak)
Field · District 06 · Rusk County · Travis Peak in every state →
Jared (Travis Peak) is an RRC field with 6 leases on file reported by 10 operators, in Rusk County.
In the 12 months reported through April 2026 it produced 44,866 mcf of gas, down 6% on the year before, from 2 leases reporting volume.
Barrow-Shaver Resources Co. holds the most, 2 leases and 0 barrels lifetime.
Lifetime, the field has reported 0 barrels of oil and 3.6 million mcf of gas.
- 6
- leases on file
- 2
- leases reporting volume
- 10
- operators, all time
- 1
- active wellbores of 5 · 1 operators today
- 0
- bbl oil, 12 months through Apr 2026
- 44,866
- Mcf gas, same 12 months · −6%
- 0
- bbl oil, lifetime · 3.6M Mcf gas
Every well completed in it, searchable →
Reported production by month
Last 12 months 44,866 · prior 12 47,615(-6%)
Jared (Travis Peak): Gas by month.
Operators
BY LIFETIME OIL ON THEIR LEASES · TOP 5
| Operator | Leases | Oil, bbl | Gas, Mcf | Last reported |
|---|---|---|---|---|
| Barrow-Shaver Resources Co. | 2 | 0 | 2.43M | Jul 2026 |
| Conquest Energy, Inc. | 1 | 0 | 378K | Jul 2026 |
| Davis Oil & Gas, LLC | 1 | 0 | 0 | Jul 2009 |
| Holt Oil and Cattle LLC | 1 | 0 | 814K | Jul 2026 |
| Powell, Gene Investments, Inc. | 1 | 0 | 0 | Jan 1998 |
Counties
- Rusk County → 6 leases
Latest completions
BY COMPLETION DATE
| Well | Operator | County | Completed | Top perf, ft | Oil, 12 mo | Gas, 12 mo |
|---|---|---|---|---|---|---|
| Siler W.H. #1 | Barrow-Shaver Resources Co. | Rusk | Jan 28, 2009 | — | 0 | 0 |
| Burton R.J. #1 | Conquest Energy Inc. | Rusk | Mar 23, 1994 | — | 0 | 0 |
| Price Sue #1 | Holt Oil and Cattle LLC | Rusk | Dec 21, 1993 | — | 0 | 0 |
| Till Ellen #a 1 U | Powell Gene Investments Inc. | Rusk | Sep 19, 1983 | — | 0 | 0 |
About this data
Field 45761700 from RRC PDQ lease reports: lifetime totals and lease and operator counts from the field summary; the monthly series summed from every lease report naming the field, cut at the statewide reported-through month, Apr 2026. Counties from the wells completed on each lease. Completions are the wellbores the RRC schedule ties to the field. The formation, Travis Peak, is read from the field's name. Nothing is estimated.
Developers: this page as JSON is GET /v1/data/fields/tx/45761700, documented in the API reference.