FIELDS · TEXAS · FIELD 68607333
Palm (Caddo)
Field · District 7B · Shackelford County and 1 more · Caddo in every state →
Palm (Caddo) is an RRC field with 5 leases on file reported by 7 operators, mostly in Shackelford County.
In the 12 months reported through April 2026 it produced 15,551 mcf of gas, up 3% on the year before, from 2 leases reporting volume.
Petex holds the most, 3 leases and 977,123 mcf of gas lifetime.
Lifetime, the field has reported 0 barrels of oil and 1.1 million mcf of gas.
- 5
- leases on file
- 2
- leases reporting volume
- 7
- operators, all time
- 3
- active wellbores of 6 · 1 operators today
- 0
- bbl oil, 12 months through Apr 2026
- 15,551
- Mcf gas, same 12 months · +3%
- 0
- bbl oil, lifetime · 1.1M Mcf gas
Every well completed in it, searchable →
Reported production by month
Last 12 months 15,551 · prior 12 15,110(+3%)
Palm (Caddo): Gas by month.
Operators
BY LIFETIME OIL ON THEIR LEASES · TOP 3
| Operator | Leases | Oil, bbl | Gas, Mcf | Last reported |
|---|---|---|---|---|
| Petex | 3 | 0 | 977K | Jul 2026 |
| Smith Pipe of Abilene | 1 | 0 | 0 | Jan 1994 |
| Stasney, H. R. & Sons, Ltd. | 1 | 0 | 95.6K | Aug 1997 |
Counties
- Shackelford County → 3 leases
- Palo Pinto County → 1 leases
Latest completions
BY COMPLETION DATE
| Well | Operator | County | Completed | Top perf, ft | Oil, 12 mo | Gas, 12 mo |
|---|---|---|---|---|---|---|
| Roberts Wade 47 #1 | Petex | Shackelford | Aug 27, 2005 | — | 0 | 0 |
| Roberts Wade 47 #3 | Petex | Shackelford | Dec 21, 2004 | — | 0 | 0 |
| Roberts Wade 47 #2 | Petex | Shackelford | Jul 6, 2004 | — | 0 | 0 |
| Landar #16 | Smith Pipe of Abilene | Palo Pinto | May 20, 1992 | — | 0 | 0 |
| Green W. H. #1 | Stasney H. R. & Sons Ltd. | Shackelford | Oct 1, 1967 | — | 0 | 0 |
| Palm F. N. #2 | Stasney Well Service LLC | Shackelford | Mar 28, 1966 | — | 0 | 0 |
About this data
Field 68607333 from RRC PDQ lease reports: lifetime totals and lease and operator counts from the field summary; the monthly series summed from every lease report naming the field, cut at the statewide reported-through month, Apr 2026. Counties from the wells completed on each lease. Completions are the wellbores the RRC schedule ties to the field. The formation, Caddo, is read from the field's name. Nothing is estimated.
Developers: this page as JSON is GET /v1/data/fields/tx/68607333, documented in the API reference.