FIELDS · TEXAS · FIELD 97930250
Windham, West (Palo Pinto SD)
Field · District 7B · Shackelford County · Palo Pinto SD in every state →
Windham, West (Palo Pinto SD) is an RRC field with 4 leases on file reported by 12 operators, in Shackelford County.
In the 12 months reported through August 2026 it produced 67 barrels of oil, versus 11 the year before, from 1 lease reporting volume.
Global Drilling, LLC holds the most, 1 lease and 150,231 mcf of gas lifetime.
Lifetime, the field has reported 194 barrels of oil and 150,476 mcf of gas, across 2 oil and 2 gas leases.
- 4
- leases on file · 2 oil, 2 gas
- 1
- leases reporting volume
- 12
- operators, all time
- 1
- active wellbores of 3 · 1 operators today
- 67
- bbl oil, 12 months through Aug 2026 · +509%
- 245
- Mcf gas, same 12 months · +717%
- 194
- bbl oil, lifetime · 150,476 Mcf gas
Every well completed in it, searchable →
Reported production by month
12 months through Aug 2026 67 · prior 12 11
Windham, West (Palo Pinto SD): Oil by month.
Operators
BY LIFETIME OIL ON THEIR LEASES · TOP 2
| Operator | Leases | Oil, bbl | Gas, Mcf | Last reported |
|---|---|---|---|---|
| Global Drilling, LLC | 1 | 127 | 150K | Jun 2025 |
| Dahab Energy Inc. | 3 | 67 | 245 | Aug 2026 |
Counties
- Shackelford County → 4 leases
Latest completions
BY COMPLETION DATE
| Well | Operator | County | Completed | Top perf, ft | Oil, 12 mo | Gas, 12 mo |
|---|---|---|---|---|---|---|
| Windham J.D. 81-N #1 | Dahab Energy Inc. | Shackelford | Sep 16, 2025 | — | — | — |
| Windham J. D. /81/ #1 | Dahab Energy Inc. | Shackelford | May 1, 2009 | — | — | — |
| Davis Estate 80 #1 | Global Drilling LLC | Shackelford | Apr 3, 1996 | — | — | — |
About this data
Field 97930250 from RRC PDQ lease reports: lifetime totals and lease and operator counts from the field summary; the monthly series summed from every lease report naming the field, cut at the statewide reported-through month, Aug 2026. Oil includes condensate from gas leases and gas includes casinghead gas from oil leases, as the RRC totals them. Counties from the wells completed on each lease. Completions are the wellbores the RRC schedule ties to the field. The formation, Palo Pinto SD, is read from the field's name. Nothing is estimated.
Developers: this page as JSON is GET /v1/data/fields/tx/97930250, documented in the API reference.