NORWAY · SAMPLES

Palynology slides on the Norwegian shelf

One row per palynology slide: depth, what it was made from (ditch cuttings, core, or sidewall core), and the laboratory code on it.

387 palynology slides match

ShowingLab HRS

387 PALYNOLOGY SLIDES · PAGE 1 OF 8

WellboreDepthUnitMade fromLab codeOperatorEntered
2/12-1 2,663.3 mHordaland GpCoreHRSNorsk Hydro Produksjon ASOct 14, 1986
2/12-1 4,668.1 mUla FmDitch cuttingsHRSNorsk Hydro Produksjon ASOct 14, 1986
2/12-1 4,668.1 mUla FmCoreHRSNorsk Hydro Produksjon ASOct 14, 1986
2/1-6 Gyda4,100 mÅsgard FmDitch cuttingsHRSBP Norway Limited U.A.Apr 30, 1984
2/1-6 Gyda4,110 mMandal FmDitch cuttingsHRSBP Norway Limited U.A.Apr 30, 1984
2/1-6 Gyda4,127 mMandal FmCoreHRSBP Norway Limited U.A.Apr 30, 1984
2/1-6 Gyda4,132 mMandal FmCoreHRSBP Norway Limited U.A.Apr 30, 1984
2/1-6 Gyda4,143.6 mMandal FmCoreHRSBP Norway Limited U.A.Apr 30, 1984
2/1-6 Gyda4,148 mMandal FmCoreHRSBP Norway Limited U.A.Apr 30, 1984
2/1-6 Gyda4,152.9 mMandal FmCoreHRSBP Norway Limited U.A.Apr 30, 1984
2/1-6 Gyda4,156.5 mMandal FmCoreHRSBP Norway Limited U.A.Apr 30, 1984
2/1-6 Gyda4,163.6 mMandal FmCoreHRSBP Norway Limited U.A.Apr 30, 1984
2/1-6 Gyda4,168.9 mFarsund FmCoreHRSBP Norway Limited U.A.Apr 30, 1984
2/1-6 Gyda4,176.9 mFarsund FmCoreHRSBP Norway Limited U.A.Apr 30, 1984
2/1-6 Gyda4,181 mFarsund FmCoreHRSBP Norway Limited U.A.Apr 30, 1984
2/1-6 Gyda4,185.3 mFarsund FmCoreHRSBP Norway Limited U.A.Apr 30, 1984
2/1-6 Gyda4,197.3 mFarsund FmCoreHRSBP Norway Limited U.A.Apr 30, 1984
2/1-6 Gyda4,205.7 mFarsund FmCoreHRSBP Norway Limited U.A.Apr 30, 1984
2/1-6 Gyda4,211.4 mFarsund FmCoreHRSBP Norway Limited U.A.Apr 30, 1984
2/1-6 Gyda4,218 mFarsund FmCoreHRSBP Norway Limited U.A.Apr 30, 1984
2/1-6 Gyda4,222.5 mFarsund FmCoreHRSBP Norway Limited U.A.Apr 30, 1984
2/1-6 Gyda4,236.8 mFarsund FmCoreHRSBP Norway Limited U.A.Apr 30, 1984
2/1-6 Gyda4,246 mFarsund FmCoreHRSBP Norway Limited U.A.Apr 30, 1984
2/1-6 Gyda4,262.6 mFarsund FmCoreHRSBP Norway Limited U.A.Apr 30, 1984
2/1-6 Gyda4,329.2 mFarsund FmCoreHRSBP Norway Limited U.A.Apr 30, 1984
2/1-6 Gyda4,333.8 mFarsund FmCoreHRSBP Norway Limited U.A.Apr 30, 1984
2/1-6 Gyda4,362.5 mFarsund FmCoreHRSBP Norway Limited U.A.Apr 30, 1984
2/1-6 Gyda4,372 mFarsund FmCoreHRSBP Norway Limited U.A.Apr 30, 1984
2/1-6 Gyda4,391 mFarsund FmCoreHRSBP Norway Limited U.A.Apr 30, 1984
2/1-6 Gyda4,394 mFarsund FmCoreHRSBP Norway Limited U.A.Apr 30, 1984
2/1-6 Gyda4,400 mFarsund FmCoreHRSBP Norway Limited U.A.Apr 30, 1984
2/1-6 Gyda4,412 mFarsund FmCoreHRSBP Norway Limited U.A.Apr 30, 1984
2/1-6 Gyda4,445 mHaugesund FmCoreHRSBP Norway Limited U.A.Apr 30, 1984
2/1-6 Gyda4,487 mHaugesund FmCoreHRSBP Norway Limited U.A.Apr 30, 1984
2/1-6 Gyda4,526 mHaugesund FmCoreHRSBP Norway Limited U.A.Apr 30, 1984
2/1-6 Gyda4,551 mHaugesund FmCoreHRSBP Norway Limited U.A.Apr 30, 1984
2/1-6 Gyda4,566 mBryne FmCoreHRSBP Norway Limited U.A.Apr 30, 1984
2/1-6 Gyda4,569 mBryne FmCoreHRSBP Norway Limited U.A.Apr 30, 1984
2/5-7 4,093 mCromer Knoll GpDitch cuttingsHRSA/S Norske ShellAug 11, 1983
2/5-7 4,105 mCromer Knoll GpDitch cuttingsHRSA/S Norske ShellAug 11, 1983
2/5-7 4,111 mMandal FmDitch cuttingsHRSA/S Norske ShellAug 11, 1983
2/5-7 4,141 mFarsund FmDitch cuttingsHRSA/S Norske ShellAug 11, 1983
2/5-7 4,174 mFarsund FmDitch cuttingsHRSA/S Norske ShellAug 11, 1983
2/5-7 4,222 mFarsund FmDitch cuttingsHRSA/S Norske ShellAug 11, 1983
2/5-7 4,261 mFarsund FmDitch cuttingsHRSA/S Norske ShellAug 11, 1983
2/5-7 4,345 mFarsund FmDitch cuttingsHRSA/S Norske ShellAug 11, 1983
2/5-7 4,360 mVestland GpDitch cuttingsHRSA/S Norske ShellAug 11, 1983
2/6-3 3,455 mFarsund FmDitch cuttingsHRSElf Petroleum Norge ASNov 9, 1982
2/6-3 3,470 mFarsund FmDitch cuttingsHRSElf Petroleum Norge ASNov 9, 1982
2/6-3 3,485 mFarsund FmDitch cuttingsHRSElf Petroleum Norge ASNov 9, 1982

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Rows are the Directorate's own records per wellbore, ordered by the wellbore's entry date (fluid samples by test date). Availability is the Directorate's flag for the sample, not a stock check. The unit on each row is the one whose top and base, in that wellbore's own tops, contain the row's depth; where no top covers it the cell is blank. The unit filter on cores uses cored length per unit and wellbore, which is how the Directorate files it.

Developers: this page as JSON is GET /v1/data/norway/samples/paly-slides, documented in the API reference.