NORWAY · WELLBORES · NPDID 138
6507/7-1
Exploration · Wildcat · P&A · Gas shows · Conoco Norway Inc. · PL 095
6507/7-1 is a wildcat exploration wellbore in the Norwegian Sea, drilled by Conoco Norway Inc., entered Aug 10, 1984, to 4,825 m in the Tilje Fm.
- 4,825
- m total depth · 4,818 m vertical
- 367
- m water depth
- Aug 10, 1984
- entered · completed Dec 1, 1984
- Tilje Fm
- at total depth · Early Jurassic
- 64.7
- m of core in 7 cores
- 170
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED MAR 1, 2026 · RELEASED DEC 1, 1986
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- NORTRYM · Semisub steel
- Drilling days
- 114
- Kelly bushing elevation
- 25 m
- Maximum inclination
- 6.80000019°
- Drilling permit
- 427-L
- Licensing round
- 8
- Plugged and abandoned
- —
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 65.45465° N, 7.21466° E
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
License 095 was awarded to the Conoco/Statoil/Arco/Tenneco group in 1984 with Conoco as operator. The area, known as Haltenbanken, is a promising oil and gas province. It straddles two major Mesozoic structural features, the Trøndelag Platform and the Vøring Basin and lies along the western flank of the series of NNE-SSW faults, which separate them. The well was drilled on the A-prospect and was designed to test a major fault block. It was hoped to test oil bearing Middle Jurassic Sandstone at approximately 3898 m with a secondary objective at the Early Jurassic level.
The well is Type Well for the Lysing Formation.
Operations and results
Wildcat well 6507/7-1 was spudded with the semi-submersible drilling rig Nortrym on 10 August 1984 and drilled to TD at a depth of 4825 in the Early Jurassic Tilje Formation. The well was drilled with seawater and hi-vis pills down to 906 m, with gypsum/polymer mud from 906 m to 3803 m, and with gypsum/lignite mud from 3803 m to TD. Few problems were experienced whilst drilling the well. Some time was lost due to gumbo-associated problems. Mud was lost to formation while cementing the 13 3/8" casing, resulting in the top of cement being lower than planned. However this did not affect the strength at the shoe, as it was possible to make a good leak off test after drilling out. Tight hole problems were experienced on a bit trip from 3716 meters, with over pull recorded on the majority of subsequent trips. In addition a gain of 45 bbls of mud at 4360 meters indicated apparent under balanced conditions. Mud weight was progressively raised from 11.2 ppg at 4081 meters to 12.6 ppg by 4360 meters in response to this problem. A further increase to 13.1 ppg was made at TD due to logging difficulties associated with tight hole. The overall operation took 115 days from spud. Total depth was reached in 87 days, while an additional 28 days were used to log, test and abandon the well.
Around this wellbore
This wellbore on Sodir FactPages →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.
Developers: this page as JSON is GET /v1/data/norway/wells/138, documented in the API reference.