NORWAY · WELLBORES · NPDID 1489

30/6-C-9

Development · Production · Plugged · Oil · Norsk Hydro Produksjon AS · Oseberg · PL 053

30/6-C-9 is a production development wellbore in the North Sea, drilled by Norsk Hydro Produksjon AS, entered Dec 11, 1989, to 4,740 m.

Discovery 30/6-1 Oseberg · On the map →

4,740
m total depth · 2,726 m vertical
108
m water depth
Dec 11, 1989
entered · completed Jan 29, 1990
—
at total depth
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED SEP 2, 2026 · RELEASED JAN 29, 1992

On file for this wellbore

Nothing yet. The Directorate has no tops, samples, logs, or documents on file for this wellbore; material from a new well is released two years after completion.

Drilling

Drilling facility
TRANSOCEAN 8 · Semisub steel
Drilling days
50
Kelly bushing elevation
25 m
Maximum inclination
—°
Drilling permit
556-P
Licensing round
4
Plugged and abandoned
Feb 20, 2017
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
60.60821° N, 2.77591° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/1489, documented in the API reference.