NORWAY · WELLBORES · NPDID 1975

30/6-C-1

Development · Injection · Plugged · Water · Norsk Hydro Produksjon AS · Oseberg · PL 053

30/6-C-1 is an injection development wellbore in the North Sea, drilled by Norsk Hydro Produksjon AS, entered Jun 3, 1992, to 6,658 m.

Discovery 30/6-1 Oseberg · On the map →

6,658
m total depth · 2,820 m vertical
108
m water depth
Jun 3, 1992
entered · completed Aug 31, 1992
—
at total depth
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED SEP 2, 2026 · RELEASED AUG 31, 1994

On file for this wellbore

Nothing yet. The Directorate has no tops, samples, logs, or documents on file for this wellbore; material from a new well is released two years after completion.

Drilling

Drilling facility
OSEBERG C · Jacket 8 legs
Drilling days
81
Kelly bushing elevation
62 m
Maximum inclination
—°
Drilling permit
720-P
Licensing round
4
Plugged and abandoned
Nov 20, 2020
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
60.60824° N, 2.77597° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/1975, documented in the API reference.