25/10-6 S is a wildcat exploration wellbore in the North Sea, drilled by Den norske stats oljeselskap a.s, entered Dec 26, 1995, to 4,706 m in the Sleipner Fm.

On the map →

4,706
m total depth · 4,281.5 m vertical
117
m water depth
Dec 26, 1995
entered · completed Mar 22, 1996
Sleipner Fm
at total depth · Middle Jurassic
12.5
m of core in 3 cores
158
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED MAR 27, 2026 · RELEASED MAR 22, 1998

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
DEEPSEA BERGEN decom · Semisub steel
Drilling days
88
Kelly bushing elevation
23 m
Maximum inclination
43.5°
Drilling permit
836-L
Licensing round
13
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
59.13575° N, 2.02709° E

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 25/10-6 S is located West-Southwest of the Balder field. The main objectives for the well were to prove the hydrocarbon potentials of the Heimdal, Ty, and the Hugin Formations.

Operations and results

Wildcat well 25/10-6 S well was spudded with the semi-submersible installation "Deepsea Bergen" on 26 December 1995 and drilled deviated to a TD of 4706 m (4281.5 m TVD) in the Middle Jurassic Sleipner Formation. The well was drilled using bentonite / CMC EHV mud down to 1039 m, with "ANCO 2000" mud from 1039 m to 2377 m, and with oil based "ANCOVERT" mud from 2377 m to TD. Several drilling problems were encountered below 1339 m and it took 30 days more than budget to reach TD. The problems included mud pump failure, MWD failure and difficulties with controlling the angle, bad weather, and bit problems. Many of the problems were due to hard formation. The well was drilled vertically to 1631 m before building angle.

Well 25/10-6 S drilled through sediments of Tertiary, Cretaceous and into Jurassic ages. The well penetrated the Heimdal Formation at 2317.5 m and the Ty Formation at 2636.5 m. The angle was then approximately 15.5°. The angle increased through the Shetland Group and reached a maximum of 43.5° at approximately 4330 m in the Vestland Group. The well penetrated the Hugin Formation at 4337.5 m (3995.5 m TVD), 41.5 m deeper than prognosed (at an angle of 42°). The potential reservoirs in Palaeocene sandstones (Heimdal and Ty Formations) were water bearing. The Hugin Formation contained hydrocarbons, but the core data and FMT-results showed tight formation. Three cores were cut in the Hugin Formation. Of these, a total of only 12.7 m core were recovered because a very hard formation wore out the bit earlier than expected No fluid samples were collected. The well was permanently plugged and abandoned on 22 March 1996 as a dry well with shows.

Testing

No drill

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/2728, documented in the API reference.