2/8-16 S

Exploration · Wildcat · Junked · Not applicable · Amoco Norway Oil Company · PL 006

2 documents: reports, logs, and plots →

2/8-16 S is a wildcat exploration wellbore in the North Sea, drilled by Amoco Norway Oil Company, entered Feb 8, 1997, to 3,139 m in the Hordaland Gp.

On the map →

3,139
m total depth · 2,101 m vertical
69.2
m water depth
Feb 8, 1997
entered · completed Mar 14, 1997
Hordaland Gp
at total depth · Eocene
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED FEB 20, 2026 · RELEASED MAR 14, 1999

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
VALHALL · Jacket 8 legs
Drilling days
35
Kelly bushing elevation
43.5 m
Maximum inclination
81.40000153°
Drilling permit
874-L
Licensing round
1-A
Plugged and abandoned
—
Core samples available
No
Cuttings samples available
No
Position · ED50
56.27799° N, 3.39545° E

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Valhall well 2/8-16 S was drilled from the Valhall platform in the Southern North Sea. The objective was to evaluate the Mjød structure in the Tor Formation on the eastern flank of the Valhall Field.

Operations and results

Wildcat well 2/8-16 S was drilled in combination with development well bores on the Valhall Field, using a down hole splitter system (DHS) marketed by Baker Oil Tools and Kværner National. The 2/8-16 S well was spudded from the "Splitter Housing" installed at ca 1409 m and proceeded without too much trouble to 1662 m where mud losses were seen. At 1927 m the losses had become severe, and this had not been seen on Valhall before. Examination of a seismic dip-map at approximately 1700 m TVD RKB showed that the well track had crossed a major fault at about the same depth as the losses became severe. The seismic image indicated the zone could be about 75 m wide. After curing the mud loss problems drilling continued to 3139 m, where a wiper trip was made back to 2100 m. On running back in hole an obstruction was hit at 2133 m. After working past this obstruction it became evident that the hole had collapsed. At this time it was decided to abandon the well track in favour of drilling an oil production well 2/8-A20 B. Well 2/8-16 S was drilled using an oil-based mud.

As the reservoir section was not reached, no log evaluation was done and the well was classified as a junk well.

No cores were cut and no wire line fluid samples taken.

The well was permanently abandoned on 14 March as a junk well.

Testing

No drill stem test was performed

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/3008, documented in the API reference.