NORWAY · WELLBORES · NPDID 304
8/11-1
Exploration · Wildcat · P&A · Dry · Phillips Petroleum Company Norway · PL 017
8/11-1 is a wildcat exploration wellbore in the North Sea, drilled by Phillips Petroleum Company Norway, entered Apr 24, 1975, to 3,810 m in the Smith Bank Fm.
- 3,810
- m total depth
- 64
- m water depth
- Apr 24, 1975
- entered · completed Jun 29, 1975
- Smith Bank Fm
- at total depth · Triassic
- —
- m of core
- 107
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED FEB 20, 2026 · RELEASED JUN 29, 1977
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- OCEAN VIKING · Semisub steel
- Drilling days
- 67
- Kelly bushing elevation
- 27 m
- Maximum inclination
- 4.5°
- Drilling permit
- 126-L
- Licensing round
- 1-A
- Plugged and abandoned
- —
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 57.10889° N, 3.64028° E
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Well 8/11-1 is located on the Sørvestlandet High towards the Åsta Graben. It was drilled on a crestal position of an elongated faulted anticline approximately 11 km long and 5 km wide. The primary objective horizon was the Jurassic Sandstone section, which from seismic information was expected to have closure of 39 km2 with a maximum of 66 m of vertical closure. Late Cretaceous limestone, Paleocene sandstone and Triassic Sandstone were secondary objectives.
Operations and results
Wildcat well 8/11-1 was spudded with the semi-submersible installation Ocean Viking on 24 April 1975 and drilled to TD at 3810 m in the Triassic Red beds. The well was drilled with seawater and Attapulgite clay down to 458 m, with seawater/Drispac and 3% diesel oil from 458 m to 1219 m, and with seawater/Drispac/lime/4-5% diesel oil from 1219 m to TD.
The formation tops and thicknesses agreed well with the geological prognosis with Paleocene coming in at 1968 m, top Cretaceous at 2143 m, the Jurassic at 2807 m, and top Triassic in the interval 2855 m to 2900 m. In the Paleocene, no sands were developed and in the Upper Cretaceous the limestone was tight. The Jurassic section consisted of 27.4 m of dark grey shale of Portlandian - Late Kimmeridgian age. The total sand section had been eroded away by the Kimmeridgian unconformity. After drilling 975 m of barren Triassic section the well was terminated at the prognosed depth of 3810 m without the Zechstein salt having been encountered. The well had no shows and thus no testing was carried out. No conventional core was cut and no fluid sample taken.
The well was permanently abandoned on 29 June 1975 as a dry well.
Testing
No drill stem test was performed
Around this wellbore
This wellbore on Sodir FactPages →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.
Developers: this page as JSON is GET /v1/data/norway/wells/304, documented in the API reference.