NORWAY · WELLBORES · NPDID 378
30/4-2
Exploration · Appraisal · P&A · Gas/condensate · BP Norway Limited U.A. · Martin Linge · PL 043
30/4-2 is an appraisal exploration wellbore in the North Sea, drilled by BP Norway Limited U.A., entered Nov 16, 1979, to 4,775 m in the Hegre Gp.
Discovery 30/7-6 Martin Linge · On the map →
- 4,775
- m total depth · 4,764 m vertical
- 123
- m water depth
- Nov 16, 1979
- entered · completed May 16, 1980
- Hegre Gp
- at total depth · Triassic
- 142.7
- m of core in 13 cores
- 163
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED MAY 16, 1982
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- SEDCO 707 · Semisub steel
- Drilling days
- 183
- Kelly bushing elevation
- 25 m
- Maximum inclination
- 8°
- Drilling permit
- 230-L
- Licensing round
- 3
- Plugged and abandoned
- —
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 60.51697° N, 2.04617° E
- Hydrocarbons in
- Brent Gp · Middle Jurassic
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Well 30/4-2 was drilled test an easterly dipping fault block on the western margin of the Viking Graben. The primary target was the Brent Group, which had already been proven to contain gas condensate by well 30/7-6 located 3 km to the South on the same structure. Secondary objectives were to test Palaeocene and Lower Eocene sandstones, and the Statfjord Formation. Well 30/7-2 had earlier encountered a hydrocarbon column with dry gas overlying heavy oil in the uppermost part of the Eocene Frigg Formation.
Operations and results
Well 30/4-2 was spudded with the semi-submersible installation SEDCO 707 on 16 November 1979 and drilled to TD at 4775 m in the Triassic Hegre Group. Bad weather caused some delay, and on 12 March, the drill string was hung-off due to adverse weather conditions. Whilst retrieving the running assembly an influx from the well was observed. The influx was bull-headed and it took five days before the well was in stable conditions again. Otherwise, no significant incident happened in the operations. The well was drilled with seawater and gel down to 1096 m, with lignosulphonate/Drispac/Gypsum mud from 1096 m to 2530 m, and with lignosulphonate/Poly-rx from 2530 to TD.
The Frigg Formation was encountered water-wet without shows at 1820 m, 36.5 m below the OWC defined in the 30/7-2 Frigg discovery. The Brent Group was encountered at 3779 m. Brent contained gas/condensate and had excellent poroperm characteristics. The gas-water contact established between 3876.5 m and 3893.5 m in the Ness Formation. The Statfjord Formation was encountered water-wet at 4337 m with only some poor shows in the top. Pressure analysis showed that it was not communicating with the Brent Group.
<span
Around this wellbore
This wellbore on Sodir FactPages →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.