6504/5-1 S is a wildcat exploration wellbore in the Norwegian Sea, drilled by Eni Norge AS, entered Mar 31, 2007, to 4,193 m in the Lange Fm.
- 4,193
- m total depth · 4,090 m vertical
- 1,190
- m water depth
- Mar 31, 2007
- entered · completed Jun 28, 2007
- Lange Fm
- at total depth · Late Cretaceous
- —
- m of core
- 130
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED FEB 20, 2026 · RELEASED JUN 28, 2009
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- TRANSOCEAN LEADER · Semisub steel
- Drilling days
- 90
- Kelly bushing elevation
- 24 m
- Maximum inclination
- 29.39999962°
- Drilling permit
- 1137-L
- Licensing round
- 18
- Plugged and abandoned
- —
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 65.69402° N, 4.37887° E
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
The Gemini well 6504/5-1 S is a wildcat well located in 1190 m water depth, far west in the Møre/Vøring Basin in the Norwegian Sea. The main purpose of the well was to test the Late Cretaceous Lysing and Nise intervals for hydrocarbons. The primary target was the Lysing Sandstones, while the Nise Sandstones were a secondary target.
Operations and results
The semi-submersible installation Transocean Leader was anchored using a pre-laid mooring system that was installed on location a few months prior the rig arrival in a proper weather window for the Anchor handling vessels. Thanks to this only 36 hours were necessary for anchoring prior to start drilling operations. Well 6504/5-1 S was spudded on 28 June 2007 and drilled to TD at 4170 m in Late Cretaceous sediments of the Lange Formation. The main operational problem during drilling was due two BOP failures. Both times the BOP was disconnected and pulled out for inspection and repair. Several components were changed, and the BOP was tested successfully both times prior to continue operations on surface and after landed and latched to wellhead. The BOP problems were the main cause of unproductive time in the well. During drilling the 8 1/2 section several losses were seen, and a kick was taken at 3521 m. A 7" liner was then installed in order to reach the well target in 5 7/8" hole. The well was drilled with Seawater and hi-vis sweeps with pre-hydrated bentonite mud down to 1592 m, with Ultradril mud from 1592 m to 1963 m, and with Formix mud from 1963 m to TD. No logs were run above 1600 m; however LWD logs were run in a pilot hole drilled by Fugro one year ahead of the 6504/5-1 S.
The primary target Lysing Sandstones were shaled out with only thin sand laminations and thin layers present. The secondary target Nise Sandstones were also shaled out. In the Lange Formation three connection / pump off gas peaks to 3.0% above background were recorded between 3486 - 3504
Around this wellbore
This wellbore on Sodir FactPages → · Press release →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.