NORWAY · WELLBORES · NPDID 5612
16/1-8
Exploration · Wildcat · Suspended · Oil · Lundin Norway AS · Edvard Grieg · PL 338
16/1-8 is a wildcat exploration wellbore in the North Sea, drilled by Lundin Norway AS, entered Sep 8, 2007, to 2,200 m in the No Group Defined.
Discovery 16/1-8 Edvard Grieg · On the map →
- 2,200
- m total depth · 2,200 m vertical
- 108
- m water depth
- Sep 8, 2007
- entered · completed Nov 13, 2007
- No Group Defined
- at total depth · Late Triassic
- 14.4
- m of core in 3 cores
- 87
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED NOV 13, 2009
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- BREDFORD DOLPHIN · Semisub steel
- Drilling days
- 67
- Kelly bushing elevation
- 25 m
- Maximum inclination
- 1.70000005°
- Drilling permit
- 1152-L
- Licensing round
- TFO2004
- Plugged and abandoned
- —
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 58.83573° N, 2.23510° E
- Hydrocarbons in
- No Group Defined · Jurassic
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Well 16/1-8 was drilled on the Luno Prospect on the eastern margin of the South Viking Graben on the south-western part of the Utsira High in the North Sea. The Luno prospect is situated between well 16/1-5 with oil shows in Late Jurassic and 16/1-4 with gas/condensate discovery in fractured basement rocks and up dip from the 16/1-7 Jurassic discovery. The primary objective of well 16/1-8 was to test the hydrocarbon potential in Late Jurassic sandstones of the Viking Group. Secondary objectives were to assess the quality of the Eocene Grid Formation and Permo-Triassic sandstones. Total depth was planned in basement at 2173 +/- 50 m.
Operations and results
Well 16/1-8 was spudded with the semi-submersible installation Bredford Dolphin on 8 September 2007 and drilled to TD at 2200 m in undefined Triassic formations consisting of conglomerates, sandstones and claystone. A shallow gas zone was warned and encountered in a thin sand from 634 - 638 m. Downtime (NPT) for the operations was as much as 33% of total rig time. Forty-four per cent of the total NPT was due to WOW before anchor handling. Another 14 % of NPT was caused by problems with cementing the 13 3/8" casing. In addition formation characteristics in the reservoir made operations challenging, and combined with increased formation evaluation scope; time spent on coring, logging and drilling to TD drastically increased compared to plan. The well was drilled with seawater and hi-vis pills down to 400 m, with KCl/glycol enhanced mud (GEM) from 400 to 1196 m, and with Performadril mud from 1196 m to TD. Performadril may contain up to 5% polyakylene glycols.
The Eocene sandstones of the Grid Formation at 155
Around this wellbore
This wellbore on Sodir FactPages → · Press release →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.
Developers: this page as JSON is GET /v1/data/norway/wells/5612, documented in the API reference.