NORWAY · WELLBORES · NPDID 6158

30/6-C-20 CY1

Development · Production · Producing · Oil · StatoilHydro Petroleum AS · Oseberg · PL 053

30/6-C-20 CY1 is a production development wellbore in the North Sea, drilled by StatoilHydro Petroleum AS, entered Sep 6, 2009, to 6,060 m.

Discovery 30/6-1 Oseberg · On the map →

6,060
m total depth · 2,743 m vertical
109
m water depth
Sep 6, 2009
entered · completed Apr 9, 2011
—
at total depth
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED SEP 2, 2026 · RELEASED APR 9, 2013

On file for this wellbore

Nothing yet. The Directorate has no tops, samples, logs, or documents on file for this wellbore; material from a new well is released two years after completion.

Drilling

Drilling facility
OSEBERG C · Jacket 8 legs
Drilling days
199
Kelly bushing elevation
62 m
Maximum inclination
—°
Drilling permit
3117-P1
Licensing round
4
Plugged and abandoned
—
Core samples available
No
Cuttings samples available
No
Position · ED50
60.60813° N, 2.77594° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/6158, documented in the API reference.