NORWAY · WELLBORES · NPDID 6260

1/3-12 S

Exploration · Wildcat · P&A · Dry · BG Norge AS · PL 297

1 document: reports, logs, and plots →

1/3-12 S is a wildcat exploration wellbore in the North Sea, drilled by BG Norge AS, entered Dec 1, 2009, to 5,931 m in the Skagerrak Fm.

On the map →

5,931
m total depth · 5,868 m vertical
70.4
m water depth
Dec 1, 2009
entered · completed Jul 22, 2010
Skagerrak Fm
at total depth · Late Triassic
8.4
m of core in 1 core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED FEB 20, 2026 · RELEASED OCT 3, 2011

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
ROWAN GORILLA VI · Jack-up 3 legs
Drilling days
234
Kelly bushing elevation
48 m
Maximum inclination
18°
Drilling permit
1287-L
Licensing round
TFO2003
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
56.75311° N, 2.82878° E

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 1/3-12 S was drilled in the Breiflabb Basin of the southern North Sea, about half-way between the Albuskjell Field and the 1/3-11 discovery. The principal objective of the well was to penetrate the Mandarin East pod and evaluate a prognosed un-faulted section of Triassic (Skagerrak Formation) within which there was a strong amplitude event that was interpreted pre‐drilling as being the Top Julius mudstone, with a Joanne Sandstone section above and the Judy Sandstone beneath. Both of these were prognosed to contain hydrocarbons. The secondary objective was to evaluate the hydrocarbon potential of the Late Jurassic Sandstones, if any were present.

Operations and results

Well 1/3-12 S was spudded with the jack-up installation Rowan Gorilla VI on 1 December 2009 and drilled to TD at 5931 m (5868 m TVD) in the Late Triassic Skagerrak Formation. At final TD the pipe became stuck and after some time working to free the pipe it parted just below the rotary table. A complex 12 day fishing operation then commenced, eventually recovering the fish from 5590 m upwards, but leaving the BHA across the Judy Sandstones. This made wire line logging operations impossible. Following recovery of the fish a further 32 days were spent plugging and abandoning the well before the rig moved off location. The well was drilled with seawater and pre-hydrated bentonite down to 1150 m, with Carbosea oil based mud from 1150 m to 5412 m, and with Magma-Teq oil based mud from 5412 m to TD.

The stratigraphic sequence was different to that expected, with a thicker Late Jurassic, and the unexpected presence of Middle Jurassic claystones and sandstones eroding do

Around this wellbore

This wellbore on Sodir FactPages → · Press release →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/6260, documented in the API reference.