NORWAY · WELLBORES · NPDID 6321
6507/5-6 S
Exploration · Appraisal · Plugged · Gas · BP Norge AS · Skarv · PL 212
6507/5-6 S is an appraisal exploration wellbore in the Norwegian Sea, drilled by BP Norge AS, entered Jan 12, 2010, to 4,991 m in the Lange Fm.
Discovery 6507/5-3 Ærfugl · On the map →
- 4,991
- m total depth · 2,907 m vertical
- 325
- m water depth
- Jan 12, 2010
- entered · completed Jun 8, 2010
- Lange Fm
- at total depth · Late Cretaceous
- 18.5
- m of core in 1 core
- —
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED FEB 20, 2026 · RELEASED JUN 8, 2012
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- BORGLAND DOLPHIN · Semisub steel
- Drilling days
- 148
- Kelly bushing elevation
- 31 m
- Maximum inclination
- 70.80000305°
- Drilling permit
- 1294-L
- Licensing round
- 15
- Plugged and abandoned
- Jun 8, 2010
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 65.73871° N, 7.65570° E
- Hydrocarbons in
- Lysing Fm · Late Cretaceous
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Well 6507/5-6 S was drilled from the Skarv A template on the Revfall Fault Complex in the Norwegian Sea. The objective of the well was to prove gas in Late Cretaceous reservoir rocks (the Lysing formation) in the Snadd North prospect. It was drilled primarily for data acquisition to identify the presence and producability of the Lysing reservoir, with the well path planned for optimal data recovery, but the well was also planned to be used as a producer.
Operations and results
Exploration well 6507/5-6 S was spudded with the semi-submersible installation Borgny Dolphin on 12 January 2010. The well was drilled as the fourth well in the batch drilling operations for the 17 1/2" and 12 1/4" sections on the Skarv A template. Initially the well was drilled to 4454 m. Then, due to hole instability and operational problems, the well was plugged back and sidetracked from 2346.4 m after a core was taken in the reservoir. Reservoir logs are therefore primarily taken in the sidetrack T2. Final TD was reached at 4991 m (2906.7 m TVD) in Late Turonian age claystone in the Lange Formation. The well was drilled with seawater and hi-vis pills down to 1122 m and with Carbosea oil based mud from 1129 m to TD in both the main and sidetrack well bores.
The Lysing Formation was encountered at 4676 m ( 2798 m TVD). Good quality hydrocarbon-bearing sandstones were discovered. A total thickness of 32 m TVD of Lysing sandstone was drilled, with net/gross of 0.88 and average effective porosity of 0.21. The sandstones in the core were of mixed quality, predominantly medium-fine grained and hydrocarbon-stained. The reservoir was hydrocarbon bearing throughout. No oil shows w
Around this wellbore
This wellbore on Sodir FactPages → · Press release →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.
Developers: this page as JSON is GET /v1/data/norway/wells/6321, documented in the API reference.