NORWAY · WELLBORES · NPDID 7522

30/9-27 S

Exploration · Appraisal · Plugged · Oil · Statoil Petroleum AS · Oseberg · PL 104

1 document: reports, logs, and plots →

30/9-27 S is an appraisal exploration wellbore in the North Sea, drilled by Statoil Petroleum AS, entered Aug 20, 2015, to 3,989 m in the Ness Fm.

Discovery 30/9-19 · On the map →

3,989
m total depth · 3,353 m vertical
103
m water depth
Aug 20, 2015
entered · completed Aug 25, 2015
Ness Fm
at total depth · Middle Jurassic
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED FEB 20, 2026 · RELEASED AUG 25, 2017

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
SONGA DELTA · Semisub steel
Drilling days
6
Kelly bushing elevation
29 m
Maximum inclination
0°
Drilling permit
1529-L
Licensing round
9
Plugged and abandoned
Aug 25, 2015
Core samples available
No
Cuttings samples available
No
Position · ED50
60.40015° N, 2.67104° E
Hydrocarbons in
Tarbert Fm · Middle Jurassic

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 30/9-27 S was drilled on the Oseberg Fault Block in the North Sea. It was drilled as a sidetrack to the 30/9-O-2 H development well. The main objective was to prove commercial volumes in the southern part of the Middle Tarbert (MT) Formation Parkes prospect.

Operations and results

Appraisal well 30/9-27 kicked off from the 14" casing shoe at 2294 m in Development well 30/9-O-2 H on 20 August 2015. It was drilled with 8 1/2" BHA to TD in the Ness Formation at 3989 m and plugged back. No significant problem was encountered in the operations. The well bore was drilled with oil based mud.

The measured reservoir pressure in MT indicates that MT is depleted by 30 to 40 bar, and that the segment-bounding fault between southern and northern segments of the Parkes prospect therefore is not a complete barrier. The logs document the reservoir quality and filling level, giving OWC at 3242m TVD MSL.

No cores were cut. No fluid sample was taken.

The exploration well bore was plugged back and abandoned on 25 August 2015 as an oil appraisal well.

Testing

No drill stem test was performed.

Around this wellbore

This wellbore on Sodir FactPages → · Press release →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/7522, documented in the API reference.