30/6-9
Exploration · Wildcat · Suspended · Oil/gas · Norsk Hydro Produksjon AS · Oseberg · PL 053
30/6-9 is a wildcat exploration wellbore in the North Sea, drilled by Norsk Hydro Produksjon AS, entered Aug 28, 1982, to 3,476 m in the Lunde Fm.
Discovery 30/6-9 · On the map →
- 3,476
- m total depth · 3,474 m vertical
- 107
- m water depth
- Aug 28, 1982
- entered · completed Dec 16, 1982
- Lunde Fm
- at total depth · Late Triassic
- 160.3
- m of core in 10 cores
- 116
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED DEC 16, 1984
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- NORTRYM · Semisub steel
- Drilling days
- 111
- Kelly bushing elevation
- 25 m
- Maximum inclination
- 5°
- Drilling permit
- 339-L
- Licensing round
- 4
- Plugged and abandoned
- —
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 60.50069° N, 2.78150° E
- Hydrocarbons in
- Brent Gp · Middle Jurassic
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Well 30/6-9 was drilled on the Gamma structure on the Oseberg Field in the northern North Sea. The Gamma structure lies on the west side of the Alpha structure and is separated from it by a large northwest-southeast fault. The primary objectives of well 30/6-9 were to test hydrocarbon accumulations in the Brent Group and find additional hydrocarbon accumulations within the Early Jurassic. This was the first well located on the Gamma structure. Planned depth for the well was ca 3360 m or 75 m into the Triassic Lunde Formation.
Operations and results
Wildcat well 30/6-9 was spudded with the semi-submersible installation Nortrym on 28 August 1982 and drilled to TD at 3476 m in the Late Triassic Lunde Formation. No significant problems occurred while drilling the well. The well was drilled with seawater, bentonite and hi-vis pills down to 975 m, with KCl/polymer mud from 975 m to 2750 m, and with lignite/lignosulphonate/freshwater mud from 2750 m to TD
Weak to strong shows were reported mainly in soft limestone stringers in the lowermost part of the Lista Formation in the Late Paleocene, in the Danian, and through the Maastrichtian. Further shows above the Brent Group were reported in cuttings in limestones from 2410 to 2422.5 m, just above the Late Jurassic unconformity.
The main target, Brent Group was penetrated from 2458 to 2620 m. It was hydrocarbon bearing over the entire interval with the gas/oil contact calculated from FMT pressure recordings at ca 2520 m. This is the same, as the GOC on the Alpha structure. No oil/water contact was encountered. The net pay in the Brent Group is calculated to be 98 m giving a net/gross ratio of 0.60. The average porosity is 22.7% with
Around this wellbore
This wellbore on Sodir FactPages →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.
Developers: this page as JSON is GET /v1/data/norway/wells/83, documented in the API reference.