Produced water and disposal in Harrison County
Every injection and disposal permit in the county, what each well is permitted to take, what its operator reported, and who is reporting daily. Earthquakes in the area →
Harrison County has 78 active injection and disposal wells, 66 of them permitted for disposal, with 669,985 barrels a day of permitted capacity.
Operators reported 56 million barrels injected on H-10 filings in the twelve months to June 2025, up 11% on the year before, about 23% of what the permits allow.
Trinity Operating (Usg), LLC is the largest injector in the county, with 14 million barrels reported across 2 active wells.
- 78
- active injection wells, 66 for disposal
- 670K
- bbl/d permitted capacity
- 56.2M
- bbl reported, H-10 year to Jun 2025 +11%
- 23%
- of permitted capacity used
- 338
- UIC permits on file, all time
Reported injection, by month
H-10 FILINGS · TEN YEARS TO JUN 2025
Last 12 months 56,170,191 · prior 12 50,391,594(+11%)
Who injects here
Operators with active permits in the county, by reported H-10 volume over the settled year.
| Operator | Reported, bbl | Active wells | Capacity bbl/d |
|---|---|---|---|
| Trinity Operating (Usg), LLC | 14.4M | 2 | 48K |
| TGNR East Texas II LLC | 7.87M | 5 | 44.5K |
| Sabine Energy Inc. | 7.57M | 7 | 82.6K |
| Latx Operations, LLC | 3.85M | 1 | 30K |
| Comstock Oil & Gas, LLC | 3.25M | 4 | 26.8K |
| McBride Operating LLC | 3.04M | 2 | 30K |
| RFE Operating, LLC | 2.79M | 4 | 68K |
| Diversified Production LLC | 2.65M | 7 | 42.2K |
| Davis Elite Energy Services LLC | 2.4M | 1 | 30K |
| Sanders Solutions #1, LLC | 2.19M | 1 | 40K |
| Select Water Solutions, LLC | 1.72M | 3 | 37.5K |
| Merit Energy Company | 1.21M | 5 | 34.3K |
| Chisos, Ltd. | 535K | 1 | 3.5K |
| Valence Operating Company | 511K | 3 | 17.5K |
| Faulconer Energy, LLC | 341K | 1 | 10K |
| Brookston Energy, Inc. | 306K | 2 | 16K |
| Topcat Truck Wash, LLC | 296K | 2 | 8K |
| Pinnergy, Ltd. | 251K | 1 | 20K |
| Rose City Resources, LLC | 244K | 3 | 6.3K |
| Mmgl East Texas III, LLC | 216K | 2 | 10.5K |
Injection permits
419 UIC PERMITS · 78 ACTIVE · PAGE 3 OF 5
Active permits first, by reported volume, then canceled, plugged, and never-activated permits.
| Well | Operator | Status | Purpose | Reported, bbl | bbl/d permitted | Zone, ft | Permitted |
|---|---|---|---|---|---|---|---|
| Shaw, Jim #1 | Topcat Oilfield Transport, LLC | Plugged | Disposal | — | 4,000 | 2,350–5,900 | Dec 5, 2014 |
| Britton Gas Unit #6 | Merit Energy Company | Plugged | Disposal | — | 4,000 | 7,730–8,250 | Feb 20, 2019 |
| Wild Boar SWD #1 | Winchester Production Company | Canceled | Disposal | — | 3,500 | 2,300–2,400 | Feb 6, 2003 |
| McGee Gas Unit "B" #2 | BP America Production Company | Canceled | Disposal | — | 3,300 | 7,500–7,800 | Oct 3, 2012 |
| South Unit #45W | Trident Production, L.L.C. | Canceled | Enhanced recovery | — | 3,000 | 4,348–4,362 | Jul 6, 1990 |
| South Unit #59D | Petroleum Production Mgmt., Inc. | Canceled | Disposal | — | 3,000 | 2,800–3,150 | Jul 6, 1978 |
| Furrh Estate #1 | Mathews Trucking Co., Inc. | Canceled | Disposal | — | 3,000 | 5,931–5,935 | Jan 31, 1990 |
| South Unit #58D | Petroleum Production Mgmt., Inc. | Canceled | Disposal | — | 3,000 | 2,800–3,150 | Jul 25, 1978 |
| South Unit #57D | Petroleum Production Mgmt., Inc. | Canceled | Disposal | — | 3,000 | 2,800–3,150 | Jul 25, 1978 |
| Brune-Burnett Gas Unit #1D | BP America Production Company | Plugged | Disposal | — | 3,000 | 3,100–4,100 | Mar 15, 2000 |
| Sallie Mae Lane Estate #1WD | Centerpoint Energy Woodlawn, LLC | Plugged | Disposal | — | 2,500 | 3,170–3,224 | May 18, 2010 |
| Bryson, J. M. Unit #1 | Exco Operating Company, LP | Plugged | Disposal | — | 2,500 | 1,915–1,940 | Dec 4, 2008 |
| Timmins Furrh #4 | Brookston Energy, Inc. | Inactive | Disposal | — | 2,500 | 2,010–2,035 | Mar 24, 2009 |
| South Unit #8W | Petroleum Production Mgmt., Inc. | Canceled | Enhanced recovery | — | 2,000 | 4,270–4,282 | Jan 11, 1980 |
| South Unit #14W | Petroleum Production Mgmt., Inc. | Canceled | Enhanced recovery | — | 2,000 | 4,294–4,305 | Jan 11, 1980 |
| South Unit #35W | Petroleum Production Mgmt., Inc. | Canceled | Enhanced recovery | — | 2,000 | 4,358–4,372 | Jan 11, 1980 |
| South Unit #67W | Trident Production, L.L.C. | Canceled | Enhanced recovery | — | 2,000 | 4,362–4,370 | Jul 6, 1990 |
| South Unit #80W | Petroleum Production Mgmt., Inc. | Canceled | Enhanced recovery | — | 2,000 | 4,363–4,371 | Jan 11, 1980 |
| South Unit #81W | Petroleum Production Mgmt., Inc. | Canceled | Enhanced recovery | — | 2,000 | 4,379–4,389 | Jan 11, 1980 |
| North Unit #33W | Trident Production, L.L.C. | Canceled | Enhanced recovery | — | 2,000 | 4,463–4,478 | Jul 22, 1969 |
| North Unit #34W | Petroleum Production Mgmt., Inc. | Canceled | Enhanced recovery | — | 2,000 | 4,473–4,481 | Jul 22, 1969 |
| Longwood Salt Water Disposal #1 | Sonat Exploration Company -Tyler | Canceled | Disposal | — | 2,000 | 3,610–3,660 | Sep 2, 1988 |
| Arnold #1 | Cotton Valley Services, Inc. | Canceled | Disposal | — | 2,000 | 6,766–6,801 | Aug 25, 1998 |
| Fultz-Adair #1 | GMX Resources Inc. | Plugged | Disposal | — | 2,000 | 5,380–5,700 | Jul 3, 2001 |
| Kranson Green #3 #3 | GMX Resources Inc. | Canceled | Disposal | — | 2,000 | 5,350–5,460 | Sep 28, 2001 |
| Green, Frank, Est. #1 | CR2 Energy LLC | Inactive | Disposal | — | 2,000 | 5,450–5,725 | Mar 22, 2002 |
| Wilborn #1SW | Talco Midstream Assets, Ltd. | Plugged | Disposal | — | 2,000 | 2,390–2,440 | Oct 4, 2002 |
| Bosch-Ruppe SWD #1 | Brammer Engineering, Inc. | Canceled | Disposal | — | 2,000 | 3,150–4,620 | Mar 12, 2004 |
| South Unit #8 | Amoco Production Company | Canceled | Enhanced recovery | — | 2,000 | 4,270–4,282 | Jan 11, 1980 |
| South Unit #14 | Amoco Production Company | Canceled | Enhanced recovery | — | 2,000 | 4,294–4,305 | Jan 11, 1980 |
| South Unit #15 | Amoco Production Company | Plugged | Enhanced recovery | — | 2,000 | 4,316–4,327 | Jan 11, 1980 |
| South Unit #21 | Amoco Production Company | Canceled | Enhanced recovery | — | 2,000 | 4,343–4,348 | Jan 11, 1980 |
| South Unit #27 | Amoco Production Company | Canceled | Enhanced recovery | — | 2,000 | 4,307–4,315 | Jan 11, 1980 |
| South Unit #29 | Amoco Production Company | Plugged | Enhanced recovery | — | 2,000 | 4,321–4,331 | Jan 11, 1980 |
| South Unit #35 | Amoco Production Company | Canceled | Enhanced recovery | — | 2,000 | 4,363–4,372 | Jan 11, 1980 |
| South Unit #81 | Amoco Production Company | Canceled | Enhanced recovery | — | 2,000 | 4,382–4,387 | Jan 11, 1980 |
| South Unit #13 | Trident Production, L.L.C. | Canceled | Enhanced recovery | — | 1,500 | 4,296–4,304 | Jul 6, 1990 |
| South Unit #21W | Petroleum Production Mgmt., Inc. | Canceled | Enhanced recovery | — | 1,500 | 4,343–4,348 | Jul 6, 1990 |
| South Unit #27W | Trident Production, L.L.C. | Canceled | Enhanced recovery | — | 1,500 | 4,302–4,315 | Jul 6, 1990 |
| South Unit #44W | Trident Production, L.L.C. | Canceled | Enhanced recovery | — | 1,500 | 4,361–4,374 | Jul 6, 1990 |
| South Unit #63W | Trident Production, L.L.C. | Canceled | Enhanced recovery | — | 1,500 | 4,390–4,410 | Jul 6, 1990 |
| South Unit #66W | Trident Production, L.L.C. | Canceled | Enhanced recovery | — | 1,500 | 4,368–4,380 | Jul 6, 1990 |
| South Unit #83W | Trident Production, L.L.C. | Canceled | Enhanced recovery | — | 1,500 | 4,410–4,418 | Jul 6, 1990 |
| South Unit #84W | Trident Production, L.L.C. | Canceled | Disposal | — | 1,500 | 4,403–4,409 | Jul 6, 1990 |
| North Unit #24W | Trident Production, L.L.C. | Canceled | Enhanced recovery | — | 1,500 | 4,460–4,468 | Jul 10, 1979 |
| North Unit #26W | Trident Production, L.L.C. | Canceled | Enhanced recovery | — | 1,500 | 4,465–4,475 | Jul 10, 1979 |
| South Unit #30W | Petroleum Production Mgmt., Inc. | Canceled | Enhanced recovery | — | 1,250 | 4,316–4,330 | Oct 30, 1972 |
| South Unit #7W | Trident Production, L.L.C. | Canceled | Enhanced recovery | — | 1,000 | 4,274–4,280 | Jul 6, 1990 |
| South Unit #51W | Petroleum Production Mgmt., Inc. | Canceled | Enhanced recovery | — | 1,000 | 4,338–4,345 | Feb 27, 1969 |
| South Unit #61W | Trident Production, L.L.C. | Canceled | Enhanced recovery | — | 1,000 | 4,446–4,455 | — |
| Boynton Heirs #1 X | Rife Oil Properties, Inc. | Canceled | Disposal | — | 1,000 | 998–1,050 | Aug 18, 1969 |
| Abney-O'Banion "SWD" #17R | Longleaf Production, LLC | Canceled | Disposal | — | 1,000 | 2,472–2,480 | Jul 9, 1993 |
| Hallsville Northeast Crane Unit #1001 | Bachtell Oil & Gas, Ltd. | Plugged | Enhanced recovery | — | 1,000 | 7,060–7,085 | Jul 16, 1981 |
| Hallsville Northeast Crane Unit #1201 | Patton Operating Co. | Canceled | Enhanced recovery | — | 1,000 | 6,914–7,080 | Sep 14, 1962 |
| Hallsville Northeast Crane Unit #1501 | Patton Operating Co. | Canceled | Enhanced recovery | — | 1,000 | 6,914 | Dec 3, 1962 |
| Hallsville Northeast Crane Unit #2402 | Patton Operating Co. | Canceled | Enhanced recovery | — | 1,000 | 6,790–6,945 | Dec 3, 1962 |
| Hallsville Northeast Crane Unit #2701 | Patton Operating Co. | Canceled | Enhanced recovery | — | 1,000 | 6,400–6,930 | Dec 3, 1962 |
| Hallsville Northeast Crane Unit #3702 | Patton Operating Co. | Canceled | Enhanced recovery | — | 1,000 | 6,804–6,908 | Dec 3, 1962 |
| Hallsville Northeast Crane Unit #3703 | Patton Operating Co. | Canceled | Enhanced recovery | — | 1,000 | 6,874–6,890 | Dec 3, 1962 |
| Hallsville Northeast Crane Unit #4401 | Patton Operating Co. | Canceled | Enhanced recovery | — | 1,000 | 6,892–6,974 | Dec 3, 1962 |
| Hallsville Northeast Crane Unit #6601 | Patton Operating Co. | Canceled | Enhanced recovery | — | 1,000 | 6,914–6,974 | Dec 3, 1962 |
| Hallsville Northeast Crane Unit #205 | Patton Operating Co. | Canceled | Enhanced recovery | — | 1,000 | 7,050–7,054 | Mar 30, 1964 |
| Hallsville Northeast Crane Unit #301 | Patton Operating Co. | Canceled | Enhanced recovery | — | 1,000 | 7,045–7,050 | Mar 30, 1964 |
| Hallsville Northeast Crane Unit #6101 | Patton Operating Co. | Canceled | Enhanced recovery | — | 1,000 | 6,956–6,964 | Dec 3, 1962 |
| Harleton, NE (Pettit) Unit #1501 | Snyder Partners | Plugged | Enhanced recovery | — | 1,000 | 7,401–7,407 | Jul 22, 1992 |
| Harleton, NE (Pettit) Unit #2101 | Snyder Partners | Canceled | Enhanced recovery | — | 1,000 | 7,430–7,434 | Jul 22, 1992 |
| North Jonesville #34 | PA Prospect LLC | Plugged | Disposal | — | 1,000 | 2,700–2,795 | Feb 6, 2003 |
| Abney-O'Banion #12 | Peak Energy Corporation | Canceled | Disposal | — | 1,000 | 2,437–2,486 | Apr 28, 1999 |
| Abney O'Banion #G 3 | King Operating Corporation | Plugged | Disposal | — | 1,000 | 2,400–2,600 | Jan 21, 2000 |
| Abney-O'Banion "B" #G 1 | Peak Energy Corporation | Canceled | Disposal | — | 1,000 | 2,400–2,600 | Jan 24, 2000 |
| South Unit #38W | Pan American Petroleum Corp. | Plugged | Enhanced recovery | — | 1,000 | 4,404–4,412 | Feb 27, 1969 |
| South Unit #69W | Pan American Petroleum Corp. | Plugged | Enhanced recovery | — | 1,000 | 4,355–4,363 | Feb 27, 1969 |
| M. Allday Gas Unit #1 | Hopewell Operating, Inc. | Canceled | Disposal | — | 850 | 5,000–5,130 | Dec 30, 1997 |
| Furrh Oil Unit #2 | Winchester Production Company | Canceled | Disposal | — | 850 | 5,004–5,091 | Jul 23, 1998 |
| Waskom /Tucker Sand/ Unit #402 | Lake, P. G., Inc. | Canceled | Enhanced recovery | — | 850 | 6,270–6,289 | Jun 11, 1968 |
| Woskom Rogers Unit #101W | Mobil Producing TX. & N.M. Inc. | Canceled | Disposal | — | 800 | 6,000–6,035 | Dec 3, 1971 |
| Woodlawn /Hill/ Unit #1 3 | Garrett Production Company | Plugged | Enhanced recovery | — | 800 | 5,781–5,787 | Aug 12, 1974 |
| Woodlawn /Hill/ Unit #1 2 | Garrett Production Company | Plugged | Enhanced recovery | — | 800 | 5,820–5,834 | Jun 12, 1973 |
| Woskom Rogers Unit #1012W | Mobil Producing TX. & N.M. Inc. | Canceled | Disposal | — | 750 | 6,135–6,159 | Dec 3, 1971 |
| Waskom Bearden Sand Unit #4W | Shelby, Michael H. | Canceled | Enhanced recovery | — | 750 | 6,078–6,090 | — |
| North Jonesville #33 | Winchester Production Company | Canceled | Disposal | — | 750 | 2,026–2,036 | Sep 9, 1987 |
| Downer #1 | Brookston Energy, Inc. | Inactive | Disposal | — | 750 | 5,050–5,068 | Mar 22, 2013 |
| Woskom Rogers Unit #107 | Mobil Oil Corporation | Plugged | Enhanced recovery | — | 750 | 6,045–6,059 | Feb 12, 1968 |
| Woskom Rogers Unit #1005 | Mobil Oil Corporation | Canceled | Enhanced recovery | — | 750 | 5,993–6,009 | Feb 12, 1968 |
| North Unit #4W | Petroleum Production Mgmt., Inc. | Canceled | Enhanced recovery | — | 620 | 4,436–4,446 | Mar 16, 1959 |
| Davis, Jim, Sr. Unit -B- #12 | Sutton, H. E. | Plugged | Disposal | — | 610 | 2,349–2,357 | Jan 18, 1977 |
| Ben-Gene Field Unit #502 | Tex-OK Energy, Ltd Partnership | Canceled | Enhanced recovery | — | 600 | 3,672–3,680 | Sep 4, 1973 |
| Bethany Travis Peak -a- Sd. Unit #A 8 | Hopewell Operating, Inc. | Canceled | Enhanced recovery | — | 600 | 6,299–6,304 | Jun 23, 1970 |
| Woodlawn /Hill/ Unit #206 | L & R Petroleum | Canceled | Disposal | — | 600 | 5,775–5,780 | Jun 1, 1984 |
| Gail Sand Unit #H 2 | Lake Ronel Oil Company | Canceled | Enhanced recovery | — | 600 | 6,176–6,191 | — |
| Gail Sand Unit #I 4 | Tyler Oil & Gas Inc. | Canceled | Enhanced recovery | — | 600 | 6,200–6,217 | Oct 8, 1981 |
| Woodlawn /Hill/ Unit #301 | Budget Production Co. | Canceled | Enhanced recovery | — | 600 | 5,906–5,911 | Dec 7, 1987 |
| Ben-Gene Field Unit #203 | Tex-OK Energy, Ltd Partnership | Plugged | Enhanced recovery | — | 600 | 3,654–3,689 | Dec 15, 1983 |
| Ben-Gene Field Unit #501 | Tex-OK Energy, Ltd Partnership | Canceled | Enhanced recovery | — | 600 | 3,628–3,662 | Dec 15, 1983 |
| Ben-Gene Field Unit #104 | Tex-OK Energy, Ltd Partnership | Canceled | Enhanced recovery | — | 600 | 3,712–3,717 | Jun 27, 1974 |
| Bethany Travis Peak -a- Sd. Unit #A 15 | Trahan, J. C. Drlg. Contr., Inc. | Plugged | Enhanced recovery | — | 600 | 6,292–6,300 | Aug 22, 1966 |
| Bethany Travis Peak -a- Sd. Unit #A 16 | Trahan, J. C. Drlg. Contr., Inc. | Plugged | Enhanced recovery | — | 600 | 6,276–6,281 | Oct 27, 1966 |
| Woodlawn /Hill/ Unit #207 | Power Management, Inc. | Plugged | Enhanced recovery | — | 600 | 5,819–5,826 | Oct 6, 1976 |
| Smith, T. P. #2 T | Triton Oil & Gas Corp. | Canceled | Disposal | — | 500 | 6,236–6,242 | May 4, 1983 |
| Woodlawn /Hill/ Unit #2014 | L & R Petroleum | Canceled | Enhanced recovery | — | 500 | 5,852–5,856 | Nov 5, 1987 |
Latest disposal drilling permits
W-1 drilling permits in the county tagged as produced-water disposal.
| Issued | Permit | Operator | Lease / well |
|---|---|---|---|
| Jan 8, 2026 | 912614 | Sabine Energy Inc. | Tower SWD #1D 20335788 |
| Jan 8, 2026 | 912615 | Sabine Energy Inc. | Sam Hall SWD #1D 20335787 |
| Jan 8, 2026 | 912615 | Sabine Oil & Gas Corporation | Sam Hall SWD #1D 20335787 |
| Jan 8, 2026 | 912614 | Sabine Oil & Gas Corporation | Tower SWD #1D 20335788 |
| Nov 17, 2025 | 911752 | TGNR East Texas II LLC | Boone SWD #1 20335777 |
| Mar 31, 2025 | 906291 | Sponte Operating, Inc. | Blocker SWD #1 20335721 |
| Feb 28, 2025 | 906225 | RFE Operating, LLC | Ricky Bobby SWD #26 20335720 |
| Feb 28, 2025 | 906225 | RFE Operating, LLC | Ricky Bobby SWD #26 20335720 |
| Jul 17, 2024 | 901310 | Davis Elite Energy Services LLC | Davis Elite SWD #3 20335683 |
| May 8, 2024 | 899538 | RFE Operating, LLC | Mulhousen SWD #2 20333176 |
About this data
RRC UIC well master and H-10 injection reports, settled through Jun 2025; TexNet daily injection for the last settled month; disposal permit tags from Petrora's sector classifier.
Developers: this page as JSON is GET /v1/data/water/tx/harrison, documented in the API reference.