WELL · 42-003-02140 · DISTRICT 8

Bakke Unit #3

Plugged

Andrews County · Bakke (Wolfcamp) field  · Vertical

Bakke Unit #3 (API 42-003-02140) is a plugged well in Andrews County, plugged October 10, 2025, last operated by Hilcorp Energy Company.

The RRC has issued 2 drilling permits between 1987 and 1991, permitted to 12,490 ft.

It was permitted by MW Petroleum Corporation and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Its 2 leases have reported 6.85M barrels of oil and 8.88M mcf of gas since January 1993, last reporting in July 2026. The leases carry 113 wells, so these are lease totals, not this well alone.

Operator of record

Hilcorp Energy Company

Permitted by MW Petroleum Corporation; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitMW Petroleum CorporationNov 7, 1991

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,490
total depth, ft
2
permits on file
Nov 7, 1991
last permit issued
Nov 10, 1987
completed
6.85M
cumulative oil, bbl
8.88M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 10, 1987
Shut in
—
Plugged
Oct 10, 2025

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 113 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Bakke Unit O-10-20882Bakke (Wolfcamp)Hilcorp Energy Company1116.82M8.79MJan 1993 – Jul 2026
Parker, J. E. K O-10-33445Bakke (Clear Fork, S.)Hilcorp Energy Company225.7K90KJan 1993 – Oct 2025

Oil, barrels lease total

Last 12 months 105,472 · prior 12 48,299(+118%)

05K10K15K202420252026

Gas, mcf lease total

Last 12 months 159,682 · prior 12 108,863(+47%)

010K20K30K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1MW Petroleum CorporationJan 1993 → Aug 1998
  2. 2Apache CorporationSep 1998 → Nov 2024
  3. 3Hilcorp Energy CompanyDec 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
393575-99RecompletionMW Petroleum CorporationNov 4, 1991Nov 7, 1991Feb 10, 199212,490
335247-99RecompletionAmoco Production CompanyAug 28, 1987Sep 15, 1987—12,490

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-20882————
—— O-10-33445————

Perforations

Perforated and open-hole intervals.

FromToType
7,6207,632Perforated
8,5328,624Perforated
8,9169,074Perforated
10,55110,571Perforated
12,41112,443Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37520017.5225 S
13.375200—300 S
9.6253,017—1,080 S
9.6255,017—1,080 S
9.6255,01812.251,080 S
9.6255,02012.251,248 S
—6,6248.75550 S
210,580——
212,430——
712,483—900 S
712,4848.75750 S
712,4878.751,200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 15, 1992Mar 19, 1992Yes
00Apr 24, 1992Dec 21, 1987Yes
00Jan 12, 1988Dec 21, 1987Yes
00Dec 30, 1987——
00Jan 12, 1984Jun 4, 1959—
00Jan 12, 1984Jun 3, 1959—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/00302140, documented in the API reference.