TEXAS · WELLS · ANDREWS COUNTY · API 42-003-39174 · DISTRICT 7B
Gray Columbus Etal #1930
Andrews County · Fuhrman-Mascho field · Injection · Vertical
Gray Columbus Etal #1930 (API 42-003-39174) is a well in Andrews County operated by GL Energy Operating LLC, completed June 20, 2011 and listed as injection on the RRC schedule.
The RRC has issued 2 drilling permits (amended once) between 2003 and 2004, permitted to 10,392 ft.
It was permitted by Encore Operating, L.P. and has since transferred to GL Energy Operating LLC on the wellbore schedule.
Completion filings report 5 formation tops, including Yates, Grayburg, San Andres, Glorieta.
Its 2 leases have reported 1.84M barrels of oil and 1.01M mcf of gas since January 1993, last reporting in July 2026. The leases carry 165 wells, so these are lease totals, not this well alone.
It holds an active disposal or injection permit, with 65.5K barrels injected in the 12 months reported through March 2026.
Operator of record
Permitted by Encore Operating, L.P.; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jul 9, 2026
- Phone
- (817) 455-2149
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Basin Oil & Gas Operating LLC |
| Production reports | Basin Oil & Gas Operating, LLCthrough Apr 2026 |
| Latest permit | Encore Operating, L.P.May 12, 2004 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,392
- total depth, ft
- 3
- permits on file
- May 12, 2004
- last permit issued
- Jun 20, 2011
- completed
- 1.84M
- cumulative oil, bbl
- 1.01M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jun 20, 2011
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 165 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Gray, Columbus, Etal O-10-1637 | Fuhrman (Glorieta) | Basin Oil & Gas Operating, LLC | 4 | 143K | 55.3K | Jan 1993 – Jul 2026 |
| Gray, Columbus Etal O-10-1719 | Fuhrman-Mascho | Basin Oil & Gas Operating, LLC | 161 | 1.7M | 951K | Jan 1993 – Jul 2026 |
Oil, barrels lease total
Last 12 months 27,432 · prior 12 25,664(+7%)
Gas, mcf lease total
Last 12 months 16,516 · prior 12 11,284(+46%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Conoco Inc.Jan 1993 → Dec 2001
- 2Encore Operating, L.P.Jan 2002 → Aug 2010
- 3Quantum Resources Management,llcSep 2010 → Dec 2014
- 4Breitburn Operating L.P.Jan 2015 → Jan 2020
- 5Vaquero Hunter Inc.Feb 2020 → Sep 2023
- 6Vaquero Permian, LLCOct 2023 → Mar 2024
- 7Basin Oil & Gas Operating, LLCApr 2024 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 545437-99 | Recompletion | Encore Operating, L.P. | May 7, 2004 | May 12, 2004 | May 20, 2004 | 10,392 |
| 538938-98 | Drill | Encore Operating, L.P. | Mar 1, 2004 | Nov 24, 2003 | — | 10,400 |
| 538938-99 | Drill | Encore Operating, L.P. | Nov 24, 2003 | Nov 24, 2003 | Jan 12, 2004 | 10,400 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jun 20, 2011 | Gray Columbus Etal O-10-1719 | Fuhrman-Mascho | GL Energy Operating LLC | Injection | 10,392 |
| Mar 2, 2004 | Gray Columbus Etal O-10-1637 | Fuhrman (Glorieta) | GL Energy Operating LLC | Not on Schedule | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,199 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Yates | 2,800 | 399 |
| Grayburg | 4,100 | -901 |
| San Andres | 4,250 | -1,051 |
| Glorieta | 5,595 | -2,396 |
| Clear ForkCLEARFORK | 5,850 | -2,651 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,292 | 4,532 | Perforated |
| 4,326 | 4,460 | Perforated |
| 5,634 | 5,672 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 350 | 12.25 | 390 S |
| 13.375 | 350 | 17.5 | 390 S |
| 8.625 | 3,900 | 11 | 1,650 S |
| 8.625 | 5,975 | 11 | 720 S |
| — | 5,975 | 11 | 720 S |
| 8.625 | — | 11 | 1,750 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 26, 2017 | Oct 19, 2017 | — |
| 00 | Sep 8, 2004 | Jun 9, 2004 | Yes |
| 00 | Aug 10, 2004 | Mar 29, 2004 | Yes |
| 00 | Jul 16, 2004 | Mar 29, 2004 | Yes |
| 00 | Jun 15, 2004 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-003-39174 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-003-39174 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 65.5K
- bbl, last 12 reported months
- 2.26M
- bbl, all reported
- Mar 2026
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000103575 | H-1 Injection | Active | 1,500 | 2,114 | 4,228–4,532 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 65,458 · prior 12 73,688(-11%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.