TEXAS · WELLS · BORDEN COUNTY · CANON RANCH UNIT LEASE · API 42-033-32349 · DISTRICT 7B
Canon Ranch Unit #3053
Borden County · JO-Mill (Spraberry) field · Shut In · Directional
Canon Ranch Unit #3053 (API 42-033-32349) is a well in Borden County operated by New Height Energy LLC, completed September 23, 2014 and listed as shut in on the RRC schedule, shut in October 1, 2023.
The RRC has issued one drilling permit, issued June 17, 2014, permitted to 7,460 ft.
It was permitted by Ppc Operating Company LLC and has since transferred to New Height Energy LLC on the wellbore schedule.
Completion filings report 10 formation tops, including Santa Rosa, Rustler, Yates, San Andres.
Its lease has reported 4.16M barrels of oil and 1.97M mcf of gas since January 1993, last reporting volume in March 2026. The lease carries 163 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by PPC Operating Company LLC; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active (A)
- P-5 last filed
- Feb 4, 2026
- Phone
- (432) 269-1562
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | New Height Energy LLC |
| Production reports | New Height Energy, LLCthrough Mar 2026 |
| Latest permit | PPC Operating Company LLCJun 17, 2014 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,460
- total depth, ft
- 1
- permits on file
- Jun 17, 2014
- last permit issued
- Sep 23, 2014
- completed
- 4.16M
- cumulative oil, bbl
- 1.97M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Sep 23, 2014
- Shut in
- Oct 1, 2023
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 163 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Canon Ranch Unit O-11-18500 | JO-Mill (Spraberry) | New Height Energy, LLC | 163 | 4.16M | 1.97M | Jan 1993 – Mar 2026 |
Oil, barrels lease total
Last 12 months 49,064 · prior 12 64,196(-24%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Pennzoil Petroleum CompanyJan 1993 → Jan 1995
- 2Pennzoil Exploration & Prod. Co.Feb 1995 → Feb 1999
- 3Pennzenergy Exp. & Prod., L.L.C.Mar 1999 → Mar 2000
- 4Devon Energy Production Co, L.P.Apr 2000 → Mar 2005
- 5OXY USA WTP LPApr 2005 → May 2005
- 6BC Operating, Inc.Jun 2005 → Nov 2012
- 7PPC Operating Company LLCDec 2012 → Dec 2017
- 8Relentless Permian Operating LLCJan 2018 → Dec 2022
- 9New Height Energy, LLCJan 2023 → Mar 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 785906-99 | Drill | PPC Operating Company LLC | Apr 30, 2014 | Jun 17, 2014 | Aug 7, 2014 | 8,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Sep 23, 2014 | Canon Ranch Unit O-11-18500 | JO-Mill (Spraberry) | New Height Energy LLC | Shut In · shut in Oct 1, 2023 | 7,460 |
Formation tops
As filed on W-2/G-1. Subsea from 2,618 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Santa RosaSANTA ROSA - GAU PROTECTION | 1,059 | 1,559 |
| RustlerRUSTLER - GAU PROTECTION | 1,358 | 1,260 |
| Yates | 1,921 | 697 |
| San AndresSAN ANDRES - HIGH FLOWS, H2S, CO | 3,228 | -610 |
| Clear ForkCLEARFORK | 4,318 | -1,700 |
| LeonardLEONARD LIME | 6,022 | -3,404 |
| Spraberry | 6,232 | -3,614 |
| CiscoCISCO - ACTIVE CO2 FLOOD | — | — |
| Wichita-AlbanyWICHITA ALBANY | — | — |
| WolfcampWOLFCAMP - STRONG WATER FLOWS | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,098 | 7,230 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 292 | 17.5 | 310 S |
| 8.625 | 3,400 | 11 | 650 S |
| 5.5 | 7,458 | 7.875 | 225 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 20, 2015 | Feb 17, 2015 | Yes |
Well logs
1 log loaded from the RRC's log index, the latest received Aug 3, 2017. Resistivity. These are the logs loaded into Petrora from the Railroad Commission's inventories, not necessarily every log run on the well. The RRC holds the files; each opens from its log search for the well. The kind is the RRC's description of the log; the interval is the one filed for it.
Open the RRC's log search for this well ↗| Logas described | Files | Intervalft, as filed | Datereceived | SizeMB |
|---|---|---|---|---|
| RESISTIVITYSpans San Andres, Clear Fork, Leonard, Spraberry | TIFF | 3,395 to 7,464 | Aug 3, 2017run Aug 16, 2014 | 5.08 |
"Spans" is by this well's own filed formation tops: a formation runs from its top to the next deeper top filed, and the deepest runs to the bottom of the log. Depths are measured along the wellbore, so on a horizontal the lateral counts in the formation it was landed in.
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-033-32349 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-033-32349 → scanned completion filings
The logs loaded for this well are under Well logs, with the RRC's log search for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/03332349, documented in the API reference.