WELL · 42-097-31248 · DISTRICT 9
Steed Netum H. -A- #2-B
Cooke County · Concho (Strawn) field · Vertical
Steed Netum H. -A- #2-B (API 42-097-31248) is a permitted well in Cooke County filed by Grayson Petroleum Company; no completion report is on file yet.
The RRC has issued 2 drilling permits between 1978 and 1979, permitted to 3,250 ft.
Completion filings report 10 formation tops, including Trinity Water Sandsn - High Wash, Bruhlmeyer Sand, Caddo, Canyon.
Its lease has reported 129K barrels of oil and 21 mcf of gas since January 1993, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- Whitesboro, TX
- P-5 status
- Active (A)
- P-5 last filed
- Apr 8, 2026
- Permits on file
- 124
- Phone
- (903) 564-6279
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Grayson Petroleum Company |
| Production reports | Grayson Petroleum Companythrough Apr 2026 |
| Latest permit | Grayson Petroleum CompanyFeb 20, 1979 |
- 3,250
- total depth, ft
- 2
- permits on file
- Feb 20, 1979
- last permit issued
- —
- completed
- 129K
- cumulative oil, bbl
- 21
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Steed, Netum H. -A- O-13-17874 | Callisburg, SW. (Strawn 3300) | Grayson Petroleum Company | 2 | 129K | 21 | Jan 1993 – Jul 2026 |
Oil, barrels lease total
Last 12 months 6,875 · prior 12 7,515(-9%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Grayson Petroleum CompanyJan 1993 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 42840-99 | Recompletion | Grayson Petroleum Company | Feb 20, 1979 | Feb 20, 1979 | Apr 16, 1979 | 3,250 |
| 17527-99 | Drill | Grayson Petroleum Company | Feb 2, 1978 | Feb 2, 1978 | — | 3,250 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-17874 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Download CSV →
| Formation | MD ft |
|---|---|
| Trinity Water Sandsn - High Wash | 1,187 |
| Bruhlmeyer Sand | — |
| CaddoCADDO LIME | — |
| Canyon | — |
| Deese | — |
| Dornick Hills | — |
| Handy Sand | — |
| PennsylvanianPENNSYLVANIAN SAND | — |
| Serratt Sand | — |
| Strawn | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,205 | 3,215 | Perforated |
| — | 3,215 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 110 | 12.5 | 75 S |
| 5.5 | 2,700 | 7.875 | 430 S |
| 2.875 | 3,260 | 4.75 | 85 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 5, 2025 | Oct 8, 2024 | — |
| 00 | Jan 12, 1984 | Mar 16, 1978 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-097-31248 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-097-31248 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/09731248, documented in the API reference.