WELL · 42-101-30721 · DISTRICT 8

Majors a Unit #4

Y

Cottle County · Broken Bone (Congl.) field · Producing  · Vertical

Majors A Unit #4 (API 42-101-30721) is a well in Cottle County operated by Wagner Oil Company, completed October 20, 2014 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued April 24, 2014, permitted to 15,000 ft.

It was permitted by Gunn Oil Company and has since transferred to Wagner Oil Company on the wellbore schedule.

Completion filings report 7 formation tops, including Coleman Junction, Canyon, Strawn, Bend.

No lease production has been reported under this well’s leases.

Operator of record

Wagner Oil Company

Permitted by Gunn Oil Company; the EWA schedule now lists a different operator.

Based in
Fort Worth, TX
P-5 status
Active (A)
P-5 last filed
Dec 23, 2025
Permits on file
278
Phone
(817) 335-2222

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWagner Oil Company
Production reportsWagner Oil Companythrough Apr 2026
Latest permitGunn Oil CompanyApr 24, 2014

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

15,000
total depth, ft
1
permits on file
Apr 24, 2014
last permit issued
Oct 20, 2014
completed
0
cumulative oil, bbl
1.84M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2014 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 20, 2014
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Majors a Unit G-11-275775Broken Bone (Congl.)Wagner Oil Company101.84MOct 2014 – Jul 2026

Gas, mcf lease total

Last 12 months 56,610 · prior 12 61,707(-8%)

05K10K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Gunn Oil CompanyOct 2014 → Jan 2023
  2. 2Wagner Oil CompanyFeb 2023 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
781387-99DrillGunn Oil CompanyMar 5, 2014Apr 24, 2014Jun 23, 201415,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-11-275775————

Formation tops

As filed on W-2/G-1. Subsea from 9,117 ft elevation.Download CSV →

FormationMD ftSubsea
Coleman JunctionCOLEMAN JUNCTION - POSSIBLE LOST3,2725,845
Canyon6,4162,701
Strawn7,0972,020
BendBEND CONGLOMERATE9,1143
BendBEND CONGLOMERATE10,114-997
Atoka——
Conglomerate——
Flippen——

Perforations

Perforated and open-hole intervals.

FromToType
9,1179,135Perforated
9,2549,269Perforated
9,7349,740Perforated
9,8999,914Perforated
10,89010,900Perforated
10,94610,969Perforated
11,45511,464Perforated
11,51811,537Perforated
11,66511,681Perforated
12,28112,297Perforated
12,58312,594Perforated
12,59812,606Perforated
12,61012,615Perforated
12,81312,821Perforated
12,82712,834Perforated
12,89412,919Perforated
12,99312,997Perforated
13,20513,217Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37542217.5500 S
9.6253,44412.25400 S
78,4888.75405 S
4.513,4496.125840 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 7, 2015Mar 16, 2015—
00Feb 12, 2015Nov 3, 2014Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/10130721, documented in the API reference.