WELL · 42-103-32527 · DISTRICT 8

Edwards C. Jr. Etal -A- #11

N

Crane County · Armer (Tubb) field  · Vertical

Edwards C. JR. Etal -A- #11 (API 42-103-32527) is a well in Crane County operated by Williams Oil Company, completed December 1, 1984.

The RRC has issued 2 drilling permits between 1981 and 1984, permitted to 6,750 ft.

It was permitted by Gulf Oil Corp. and has since transferred to Williams Oil Company on the wellbore schedule.

Completion filings report 6 formation tops, including Rustler, Yates, Mcelroy, Tubb.

Its lease has reported 104K barrels of oil and 179K mcf of gas since January 1993, last reporting in July 2026. The lease carries 8 wells, so these are lease totals, not this well alone.

Operator of record

Williams Oil Company

Permitted by Gulf Oil Corp.; the EWA schedule now lists a different operator.

Based in
Midland, TX
P-5 status
Active (A)
P-5 last filed
Jan 12, 2026
Permits on file
177
Phone
(432) 682-0363

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWilliams Oil Company
Production reportsWilliams Oil Companythrough Apr 2026
Latest permitGulf Oil Corp.Aug 21, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,750
total depth, ft
2
permits on file
Aug 21, 1984
last permit issued
Dec 1, 1984
completed
104K
cumulative oil, bbl
179K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 1, 1984
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 8 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Edwards, C., Jr., Etal -A- O-10-9005Armer (6350)Williams Oil Company8104K179KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 610 · prior 12 883(-31%)

0100200202420252026

Gas, mcf lease total

Last 12 months 1,698 · prior 12 2,129(-20%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Williams Oil CompanyJan 1993 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
249001-99RecompletionGulf Oil Corp.Aug 20, 1984Aug 21, 1984—6,575
110831-99DrillGulf Oil Corp.Mar 4, 1981Mar 4, 1981Apr 1, 19816,750

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-9005————

Formation tops

As filed on W-2/G-1. Subsea from 2,703 ft elevation.Download CSV →

FormationMD ftSubsea
Rustler5402,163
Yates1,870833
McElroy2,765-62
Tubb4,944-2,241
Wichita-AlbanyWICHITA ALBANY5,320-2,617
Wolfcamp6,165-3,462
Wolfcamp6,344-3,641

Perforations

Perforated and open-hole intervals.

FromToType
4,9444,985Perforated
6,3446,350Perforated
6,3446,400Perforated
6,4296,541Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62564112.25250 S
2.3756,466——
5.56,5747.8751,200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 10, 2002Nov 20, 2001—
00Nov 22, 1985Oct 31, 1985—
00Apr 12, 1985Apr 1, 1985—
00Apr 11, 1985——
00Jan 12, 1984Jun 10, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/10332527, documented in the API reference.